Maritime Questions › Permit To Work Rank
Coming on watch, an OOW finds isolation tags in place from the previous shift with no handover note about whether the job is finished. What should the OOW do before assuming anything about the equipment's status?
A. Assume the job is still ongoing, since the tags are still present
B. Leave the equipment as-is and let the following watch resolve the ambiguity
C. Assume the job is finished, since enough time has passed since the previous shift
D. Actively seek out the person who applied the isolation (or the authorising officer) to get a proper handover, rather than assuming the job is either finished or still ongoing based on the tag alone
Sign in or create a free account to see the answer and explanation.
A. There is no fixed maximum — it depends entirely on the job
B. 48 hours, renewable once without re-inspection
C. 24 hours from issue, with any shorter job-specific time limits also stated on the permit
D. 7 days, matching the standard watch rotation
Sign in or create a free account to see the answer and explanation.
A. Accept the outgoing OOW's assessment and take no further action since the job scope hasn't changed
B. Cancel the job immediately without consulting the authorising officer
C. Wait until the 24-hour mark is actually reached before mentioning anything
D. Check elapsed time against the 24-hour limit, recognise it's close to expiry, and flag to the authorising officer that revalidation will be needed rather than letting it lapse unnoticed
Sign in or create a free account to see the answer and explanation.
+36 more Permit To Work Rank questions available
Create a free account to practise all 39 questions, track your accuracy, and build your Reputation Score.
Create Free Account