Maritime QuestionsDP — Risk Assessment

The client representative wants to start a DP operation immediately, and asks the Master to skip the pre-task risk assessment review because "the standard one already covers it." The task today has a non-standard element (a heavier load than usual). What should the Master do?

A. Agree to proceed since the client is satisfied the standard assessment is sufficient
B. Decline to skip the review — a non-standard element means the standard risk assessment may not adequately cover today's hazards; the review must be completed, even briefly, before work starts, regardless of client pressure
C. Proceed but verbally note the heavier load in the DP log afterward
D. Delegate the decision to the DPO without involving the wider team
Sign in or create a free account to see the answer and explanation.
In the context of planning a DP operation, what is the fundamental difference between a HAZID and a HAZOP?
A. A HAZOP is conducted by the DPO alone; a HAZID requires the whole bridge team
B. A HAZID is only used for diving operations; a HAZOP is only used for drilling operations
C. A HAZID (Hazard Identification) is a broad, early-stage exercise to identify what could go wrong across the whole operation; a HAZOP (Hazard and Operability study) is a more structured, systematic review of a specific system or procedure using guide words to probe deviations from intended operation
D. They are interchangeable terms for the same process required by different classification societies
Sign in or create a free account to see the answer and explanation.
When preparing a task-specific risk assessment for a DP operation (e.g. a subsea lift), what DP-specific inputs must the risk assessment draw on, beyond generic task hazards?
A. The vessel's WCF, current ASOG limits, footprint/consequence analysis for the specific location, position reference availability, and proximity to fixed/floating structures or other vessels
B. Only the crew's certification and rest hours
C. Only the weather forecast for the next 24 hours
D. DP-specific factors are not part of a task risk assessment — they are covered separately in the FMEA
Sign in or create a free account to see the answer and explanation.
+7 more DP — Risk Assessment questions available

Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.

Create Free Account