Maritime Questions › DP — Risk Assessment
What is the specific purpose of a toolbox talk immediately before starting a DP operation, as distinct from the written risk assessment?
A. It is purely a legal formality with no operational value
B. It is only required for new crew members, not for experienced personnel
C. It replaces the need for a written risk assessment
D. It confirms that everyone involved understands the plan, their role, the current hazards and controls, and gives them the opportunity to raise concerns or changes in conditions before the operation starts — a live verification that the paper risk assessment still matches reality
Sign in or create a free account to see the answer and explanation.
A. A HAZID (Hazard Identification) is a broad, early-stage exercise to identify what could go wrong across the whole operation; a HAZOP (Hazard and Operability study) is a more structured, systematic review of a specific system or procedure using guide words to probe deviations from intended operation
B. A HAZID is only used for diving operations; a HAZOP is only used for drilling operations
C. A HAZOP is conducted by the DPO alone; a HAZID requires the whole bridge team
D. They are interchangeable terms for the same process required by different classification societies
Sign in or create a free account to see the answer and explanation.
A. Only the crew's certification and rest hours
B. The vessel's WCF, current ASOG limits, footprint/consequence analysis for the specific location, position reference availability, and proximity to fixed/floating structures or other vessels
C. Only the weather forecast for the next 24 hours
D. DP-specific factors are not part of a task risk assessment — they are covered separately in the FMEA
Sign in or create a free account to see the answer and explanation.
+7 more DP — Risk Assessment questions available