Maritime Questions › DP — Blackout Response
The cargo operations were eventually completed safely. No contact was made with the platform. The master is reviewing reporting obligations. The blackout caused: total loss of DP for 4 minutes, drift to 42m from the platform, and manual joystick recovery with two thrusters. No injury and no damage. Which bodies must be informed of this incident and within what timeframe?
A. Reporting obligations include: the flag state (many require DP incidents to be reported regardless of outcome), the vessel's classification society (loss of class-relevant system capability), IMCA (if the operator is a member — voluntary reporting is how the industry learns), the client/installation (they were directly involved), and the company SMS non-conformity system. Timeliness varies by flag state but most require initial report within 24 hours
B. Only the client needs to be informed — they are the only external party directly involved
C. The platform OIM must be formally notified but no statutory reporting body has jurisdiction since the vessel is on the high seas
D. No external reporting is required — no contact, no injury, and no damage occurred
Sign in or create a free account to see the answer and explanation.
A. Wait to see if G1 auto-restarts before taking any action — it may recover within 30 seconds
B. Inform the engine room and wait for their assessment before taking any DP action
C. Close the bus tie immediately to ensure power continuity for all thrusters
D. Immediately check the power status panel to confirm which generators are online, verify the bus is still open, and assess whether the remaining power configuration still meets DP2 WCF requirements in the current conditions
Sign in or create a free account to see the answer and explanation.
A. Switch all thrusters to minimum power to reduce electrical demand instantly
B. Manually close the bus to share the load between both sections and prevent G2 from tripping
C. Wait for the PMS to complete its auto-load-shed cycle before intervening
D. Inform the master immediately, declare a DP Alert, begin controlled manual thruster reduction on the most loaded thrusters to reduce electrical demand and help stabilise G2, while simultaneously monitoring position
Sign in or create a free account to see the answer and explanation.
+7 more DP — Blackout Response questions available
Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.
Create Free Account