Maritime Questions › DP — Blackout Response
The vessel is now at 500m standoff. All three generators are online, bus is open, all four thrusters are operational, all three DGNSS units are in agreement, and the master has full DP2 capability restored. The project manager calls and asks when the vessel can return to 80m to resume cargo operations. What must happen before the vessel returns to the 80m working position?
A. Return immediately and complete the post-incident steps while back on position
B. The vessel can return immediately — full DP2 capability has been restored
C. Return once the consequence analysis test has been passed — no other steps are required
D. Before returning to the working position, the vessel must: run a full consequence analysis test at the current standoff position, confirm ASOG criteria are met with the current configuration, brief the DPO team on the incident and any changes in system status, confirm the platform OIM is satisfied and agrees to the vessel returning, and log the blackout incident formally in the DP and official logbooks
Sign in or create a free account to see the answer and explanation.
A. Wait to see if G1 auto-restarts before taking any action — it may recover within 30 seconds
B. Inform the engine room and wait for their assessment before taking any DP action
C. Close the bus tie immediately to ensure power continuity for all thrusters
D. Immediately check the power status panel to confirm which generators are online, verify the bus is still open, and assess whether the remaining power configuration still meets DP2 WCF requirements in the current conditions
Sign in or create a free account to see the answer and explanation.
A. Switch all thrusters to minimum power to reduce electrical demand instantly
B. Manually close the bus to share the load between both sections and prevent G2 from tripping
C. Wait for the PMS to complete its auto-load-shed cycle before intervening
D. Inform the master immediately, declare a DP Alert, begin controlled manual thruster reduction on the most loaded thrusters to reduce electrical demand and help stabilise G2, while simultaneously monitoring position
Sign in or create a free account to see the answer and explanation.
+7 more DP — Blackout Response questions available