Maritime QuestionsDP — Blackout Response

The gas platform OIM calls the bridge and orders the vessel to move to a standoff of 500m as a precaution following the blackout. The master believes the vessel is now stable under manual joystick with two verified references. The vessel is at 42m from the platform. Does the OIM have the authority to direct the vessel's manoeuvring, and how should the master respond?

A. Ask the client representative on board to mediate between the master and the OIM
B. No — the master has sole command of the vessel and the OIM has no authority to direct manoeuvring
C. The OIM has authority as the installation authority to direct vessels operating in the field to move to safe distances for installation safety reasons. The master should comply with the instruction to increase standoff, as the OIM's assessment of installation risk following a vessel blackout event is a legitimate safety decision — while retaining command of how the vessel moves to achieve the standoff
D. Comply with the OIM's instruction only if the master independently agrees the 500m standoff is necessary
Sign in or create a free account to see the answer and explanation.
EMERGENCY SCENARIO — DP2 PLATFORM SUPPLY VESSEL Vessel: Offshore PSV, DP2 class. Location: 80m from a fixed gas platform, holding position to deliver equipment. DPO on watch. Three DGNSS references active, two gyros operational (Gyro 3 offline for calibration). Sea state: 1.8m, wind 22 knots SW. Thruster configuration: full complement, open bus, consequence analysis test passed 90 minutes ago. Work through the following 10 decision points in sequence — each builds on the last. --- POINT 1 OF 10 --- Without warning, the main generator (G1) trips offline. The DP system sounds an alarm. The bus is still open. The remaining generators (G2, G3) are online and picking up load. Position is currently stable. What is the DPO's first action?
A. Wait to see if G1 auto-restarts before taking any action — it may recover within 30 seconds
B. Inform the engine room and wait for their assessment before taking any DP action
C. Close the bus tie immediately to ensure power continuity for all thrusters
D. Immediately check the power status panel to confirm which generators are online, verify the bus is still open, and assess whether the remaining power configuration still meets DP2 WCF requirements in the current conditions
Sign in or create a free account to see the answer and explanation.
20 seconds after G1 tripped, G2 begins overloading as it attempts to absorb G1's load. G2's frequency is dropping. The power management system (PMS) is attempting to auto-shed non-essential loads. The DPO has confirmed that DP2 WCF may not be maintained if G2 also trips. What is the DPO's priority action at this point?
A. Switch all thrusters to minimum power to reduce electrical demand instantly
B. Manually close the bus to share the load between both sections and prevent G2 from tripping
C. Wait for the PMS to complete its auto-load-shed cycle before intervening
D. Inform the master immediately, declare a DP Alert, begin controlled manual thruster reduction on the most loaded thrusters to reduce electrical demand and help stabilise G2, while simultaneously monitoring position
Sign in or create a free account to see the answer and explanation.