Maritime QuestionsDP — Blackout Response

G1 has now recovered and come online. Full power is available. Four minutes have elapsed since the initial generator trip. The vessel is at 42m from the platform, drift has been arrested by manual thruster use, and position is now roughly stable under manual joystick control. The DPO is tempted to re-engage DP auto to recover the situation more quickly. Should the DPO re-engage DP auto mode immediately?

A. Yes — DP auto is more accurate and will recover position faster than manual joystick
B. Re-engage auto DP on position hold only, without heading control, to reduce thruster demand
C. Ask the platform controller for permission before re-engaging DP auto
D. Not yet. Before re-engaging DP auto, the DPO must verify the reference system status (have any GPS units drifted during the blackout?), confirm all three generators are stable, open the bus to restore DP2 redundancy, and run a rapid consequence analysis check — re-engaging DP auto with degraded or unverified reference inputs could drive the vessel further toward the platform if a reference has been corrupted during the blackout
Sign in or create a free account to see the answer and explanation.
EMERGENCY SCENARIO — DP2 PLATFORM SUPPLY VESSEL Vessel: Offshore PSV, DP2 class. Location: 80m from a fixed gas platform, holding position to deliver equipment. DPO on watch. Three DGNSS references active, two gyros operational (Gyro 3 offline for calibration). Sea state: 1.8m, wind 22 knots SW. Thruster configuration: full complement, open bus, consequence analysis test passed 90 minutes ago. Work through the following 10 decision points in sequence — each builds on the last. --- POINT 1 OF 10 --- Without warning, the main generator (G1) trips offline. The DP system sounds an alarm. The bus is still open. The remaining generators (G2, G3) are online and picking up load. Position is currently stable. What is the DPO's first action?
A. Wait to see if G1 auto-restarts before taking any action — it may recover within 30 seconds
B. Inform the engine room and wait for their assessment before taking any DP action
C. Close the bus tie immediately to ensure power continuity for all thrusters
D. Immediately check the power status panel to confirm which generators are online, verify the bus is still open, and assess whether the remaining power configuration still meets DP2 WCF requirements in the current conditions
Sign in or create a free account to see the answer and explanation.
20 seconds after G1 tripped, G2 begins overloading as it attempts to absorb G1's load. G2's frequency is dropping. The power management system (PMS) is attempting to auto-shed non-essential loads. The DPO has confirmed that DP2 WCF may not be maintained if G2 also trips. What is the DPO's priority action at this point?
A. Switch all thrusters to minimum power to reduce electrical demand instantly
B. Manually close the bus to share the load between both sections and prevent G2 from tripping
C. Wait for the PMS to complete its auto-load-shed cycle before intervening
D. Inform the master immediately, declare a DP Alert, begin controlled manual thruster reduction on the most loaded thrusters to reduce electrical demand and help stabilise G2, while simultaneously monitoring position
Sign in or create a free account to see the answer and explanation.
+7 more DP — Blackout Response questions available

Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.

Create Free Account