Maritime QuestionsDP — Blackout Response

G3 has now tripped. Total blackout. All thrusters offline. Emergency power only. Bridge instruments powered by UPS. The vessel is drifting. Last known position was 80m from the platform. Wind is pushing the vessel toward the installation. The master has arrived on the bridge. With total blackout and the vessel drifting toward the platform, what is the master's priority decision?

A. Order Mayday to the Coast Guard and all vessels in the area
B. Attempt emergency start of all generators simultaneously from the ECR
C. Abandon ship immediately — the platform collision risk is imminent
D. Assess drift rate and direction, confirm platform crew have been warned, coordinate with the chief engineer on emergency blackout recovery timeline, and determine whether the vessel will clear the platform on current drift or whether emergency anchoring is needed as a last resort
Sign in or create a free account to see the answer and explanation.
EMERGENCY SCENARIO — DP2 PLATFORM SUPPLY VESSEL Vessel: Offshore PSV, DP2 class. Location: 80m from a fixed gas platform, holding position to deliver equipment. DPO on watch. Three DGNSS references active, two gyros operational (Gyro 3 offline for calibration). Sea state: 1.8m, wind 22 knots SW. Thruster configuration: full complement, open bus, consequence analysis test passed 90 minutes ago. Work through the following 10 decision points in sequence — each builds on the last. --- POINT 1 OF 10 --- Without warning, the main generator (G1) trips offline. The DP system sounds an alarm. The bus is still open. The remaining generators (G2, G3) are online and picking up load. Position is currently stable. What is the DPO's first action?
A. Wait to see if G1 auto-restarts before taking any action — it may recover within 30 seconds
B. Inform the engine room and wait for their assessment before taking any DP action
C. Close the bus tie immediately to ensure power continuity for all thrusters
D. Immediately check the power status panel to confirm which generators are online, verify the bus is still open, and assess whether the remaining power configuration still meets DP2 WCF requirements in the current conditions
Sign in or create a free account to see the answer and explanation.
20 seconds after G1 tripped, G2 begins overloading as it attempts to absorb G1's load. G2's frequency is dropping. The power management system (PMS) is attempting to auto-shed non-essential loads. The DPO has confirmed that DP2 WCF may not be maintained if G2 also trips. What is the DPO's priority action at this point?
A. Switch all thrusters to minimum power to reduce electrical demand instantly
B. Manually close the bus to share the load between both sections and prevent G2 from tripping
C. Wait for the PMS to complete its auto-load-shed cycle before intervening
D. Inform the master immediately, declare a DP Alert, begin controlled manual thruster reduction on the most loaded thrusters to reduce electrical demand and help stabilise G2, while simultaneously monitoring position
Sign in or create a free account to see the answer and explanation.
+7 more DP — Blackout Response questions available

Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.

Create Free Account