Olivia: The Night Shift, the Boiler and the Midnight Phone Call
Olivia
Bulk carrier (boiler blowback, injuries) · Bluff, New Zealand · 24 May 2025
Source: TAIC MO-2025-204
The Situation
A routine cleaning job in the fifth week of repairs, a hot furnace and a call to a sleeping chief engineer. Decide when the job stopped being routine.
The Lesson
Treat a failed boiler restart as unplanned work. Verify the furnace is cool, read back the scope, and wear face protection.
Human Element
Fatigue, poor communication, familiarity with a task and a generic risk assessment combined when routine work became emergent higher-risk work.
Try the First Decision
23 May 2025, 2350. You are the night-shift third engineer on OLIVIA, alongside in Bluff in the fifth week of generator repairs. The oil-fired boiler is the only source of steam. It flamed out earlier and a restart attempt at 2346 caused a blowback through the air intake and set off the fire alarm. Nobody is hurt and the superintendent has silenced the alarm. The master and chief engineer have been told there is no urgent issue. Your night shift is you, a fitter and a motorman. What do you do?
This is a preview — the full scenario branches from here based on what you choose, with real consequences and a debrief at the end.
Play the Full Scenario — Free
Create a free profile to play this scenario through to the end, with a full human-factors debrief. No card required.
Create Free Profile & Play →