Eidsvaag Marin: Changing the Valve Block Underway

Eidsvaag Marin
General cargo ship, fish feed (crush fatality) · Byfjorden near Stavanger, Norway · 29 October 2025
Source: NSIA marine report 2026/05

3Decision Points 2Possible Outcomes —Avg. Play Time

The Situation

A new valve block, a short passage and a machine with no written procedure for the job. Decide what must be in place before anyone disconnects a hydraulic hose.

The Lesson

Before disconnecting hydraulics, know what the pressure is holding and where it moves when lost. Fit the physical lock, write the step down, and train on the specific machine.

Human Element

Competence and experience were assumed to cover a task nobody had written down. One operational barrier, no physical barrier, and a platform design that favoured the half-way position.

Try the First Decision

29 October 2025, about 0900. You are the master of EIDSVAAG MARIN alongside in Stavanger with a crew of seven. A new valve block for the material handler has just arrived. The old one is causing problems with hydraulic oil distribution to the lifting yoke. The engine attendant wants to change it on the 4.5-hour passage to Røvær, where the machine is needed. He has inspected the block and says the job will go fine. He has never changed one on this type of machine but has done other maintenance behind the lifting frame. Nothing in the company's documents covers this task. What do you do?

A. Ask what will hold the cab and lifting frame when the hose is disconnected, check the manual, and agree the steps before sailing.
B. Agree. He is experienced and qualified, and there is plenty of time on the passage.

This is a preview — the full scenario branches from here based on what you choose, with real consequences and a debrief at the end.

Play the Full Scenario — Free

Create a free profile to play this scenario through to the end, with a full human-factors debrief. No card required.

Create Free Profile & Play →