The Situation
A routine wash-down on a short ballast voyage, a permit that does not mention one task, and a crew used to standing on open hatch covers. Decide when the plan stopped matching the job.
The Lesson
A written rule is only a barrier if the real practice matches it. Make the permit cover the task as it will be done, and stop work when you see the route change.
Human Element
Normalised deviation from a written rule, a permit that followed work as imagined, time pressure on a short voyage, and no challenge when a crew member left the planned route.
Try the First Decision
1 April 2026, about 0750. You are the bosun on ALGOMA VICTORY, on a short ballast voyage. The chief officer has just done the job safety analysis and toolbox talk. Two able seafarers will wash inside the holds, the ordinary seafarer will wash the conveyor belt inside the boom, tunnel technicians will wash below, and you will supervise and wash the main deck. The work at height permit lists you and three able seafarers. It does not mention the ordinary seafarer or the boom. The plan says hatch covers are washed closed. The boom is parked at an angle. What do you do?
This is a preview — the full scenario branches from here based on what you choose, with real consequences and a debrief at the end.
Play the Full Scenario — Free
Create a free profile to play this scenario through to the end, with a full human-factors debrief. No card required.
Create Free Profile & Play →