Dynamic Positioning

DP Mini Guide: PRS — Bad or Unreliable Reference

🕑 8 min read 1300 words Dp-academy

Crew Connect DP Academy · Mini Guide 03

PRS — Bad or Unreliable Reference

Topic: Position Reference Systems · Sub-topic: PRS Quality  ·  Level: DPO  ·  Read time: 8 min

Training scenario only. In an actual operation, follow the approved vessel- and activity-specific procedures, ASOG/CAM/TAM, FMEA and emergency response arrangements; apply the Master’s authority and escalate through the applicable command structure. This guide is Crew Connect educational content — it does not override your vessel’s approved documents.

1. What / Why / How

Accuracy, availability, reliability and integrity are four distinct properties of a PRS. A reference can be available (turned on, reporting a number) while being neither accurate nor reliable. Drift, noise, offset, position jumps and a falsely plausible value are all different failure signatures worth being able to tell apart.

2. Recognition / Risk / But

Compare reference residuals, trends, the DP model's behaviour and independent sources against each other. The risk: the DP controller may act on incorrect information that never triggered an alarm.

But: rejecting a genuinely good reference solely because it disagrees with two references that share a common mode can also be the wrong call — disagreement doesn't automatically mean the odd one out is the faulty one.

3. Now / What next / Decision / Why

Identify the discrepancy precisely, cross-check independent-principle sources and the operational context, preserve the evidence (don't just clear the alarm), and apply your vessel's approved reference-management procedure rather than an ad-hoc judgement call.

4. Consequence / Reassess / Escalate

A position jump is followed by apparent stabilisation. The key question: is "stable again" sufficient evidence of recovery? It is not — revise the operational status based on verified cause, not on the number simply looking normal again.

5. Recover / Verify / Human factor

Verify root cause or credible restoration through independent checks before trusting the reference fully again. Trap: confirmation bias, and normalisation of a small recurring offset ("it always does that") that quietly erodes the standard you'd apply to a first-time fault.

Crew Connect takeaway

An available reference is a hypothesis about the vessel's position, not a fact — the DPO's job is to keep testing that hypothesis against independent evidence, especially when nothing has alarmed.

▶ Enter the Decision Simulator — PRS Unreliable Data Chain

Work the same situation through 8 linked decisions, with a real consequence at each step.

Sources: IMCA M252 (position reference systems and sensors), IMO MSC.1/Circ.1580, IMCA DPE 04/18 and DPE 02/22 (reference selection/set-up learning cases). This guide is educational content, not a substitute for accredited DP training, vessel-specific FMEA/ASOG, or full-mission simulator assessment. Crew Connect never infers compliance with a specific vessel's applicable requirements — always verify against your own approved documents.

Could You Have Prevented It?

Test your judgement in Crew Connect's Decision Simulator — real incident patterns, real consequences, free to try.

Try the Decision Simulator Free →

Ready to advance your maritime career?

Free verified profile. Certificate tracking. Get found directly by shipping companies — no crewing agent, no placement fees.

Create Free Profile — 60 Seconds

Browse maritime jobs by rank & sector

Chief Officer Jobs DP Operator Jobs Chief Engineer Jobs Offshore Crew Jobs Superyacht Crew Jobs Wind Farm CTV Jobs Jobs for Filipino Seafarers Jobs for UK Seafarers