Dynamic Positioning

DP Mini Guide: PRS — Bad or Unreliable Reference

🕑 8 min read 1300 words Dp-academy

Crew Connect DP Academy · Mini Guide 03

PRS — Bad or Unreliable Reference

Topic: Position Reference Systems · Sub-topic: PRS Quality  ·  Level: DPO  ·  Read time: 8 min

Training scenario only. In an actual operation, follow the approved vessel- and activity-specific procedures, ASOG/CAM/TAM, FMEA and emergency response arrangements; apply the Master’s authority and escalate through the applicable command structure. This guide is Crew Connect educational content — it does not override your vessel’s approved documents.

1. What / Why / How

Accuracy, availability, reliability and integrity are four distinct properties of a PRS. A reference can be available (turned on, reporting a number) while being neither accurate nor reliable. Drift, noise, offset, position jumps and a falsely plausible value are all different failure signatures worth being able to tell apart.

2. Recognition / Risk / But

Compare reference residuals, trends, the DP model's behaviour and independent sources against each other. The risk: the DP controller may act on incorrect information that never triggered an alarm.

But: rejecting a genuinely good reference solely because it disagrees with two references that share a common mode can also be the wrong call — disagreement doesn't automatically mean the odd one out is the faulty one.

3. Now / What next / Decision / Why

Identify the discrepancy precisely, cross-check independent-principle sources and the operational context, preserve the evidence (don't just clear the alarm), and apply your vessel's approved reference-management procedure rather than an ad-hoc judgement call.

4. Consequence / Reassess / Escalate

A position jump is followed by apparent stabilisation. The key question: is "stable again" sufficient evidence of recovery? It is not — revise the operational status based on verified cause, not on the number simply looking normal again.

5. Recover / Verify / Human factor

Verify root cause or credible restoration through independent checks before trusting the reference fully again. Trap: confirmation bias, and normalisation of a small recurring offset ("it always does that") that quietly erodes the standard you'd apply to a first-time fault.

Crew Connect takeaway

An available reference is a hypothesis about the vessel's position, not a fact — the DPO's job is to keep testing that hypothesis against independent evidence, especially when nothing has alarmed.

▶ Enter the Decision Simulator — PRS Unreliable Data Chain

Work the same situation through 8 linked decisions, with a real consequence at each step.

Sources: IMCA M252 (position reference systems and sensors), IMO MSC.1/Circ.1580, IMCA DPE 04/18 and DPE 02/22 (reference selection/set-up learning cases). This guide is educational content, not a substitute for accredited DP training, vessel-specific FMEA/ASOG, or full-mission simulator assessment. Crew Connect never infers compliance with a specific vessel's applicable requirements — always verify against your own approved documents.

Could You Have Prevented It?

Test your judgement in Crew Connect's Decision Simulator — real incident patterns, real consequences, free to try.

Try the Decision Simulator Free →

Ready to advance your maritime career?

Free verified profile. Certificate tracking. Get found directly by shipping companies — no crewing agent, no placement fees.

Create Free Profile — 60 Seconds

Browse maritime jobs by rank & sector

Chief Officer Jobs DP Operator Jobs Chief Engineer Jobs Offshore Crew Jobs Superyacht Crew Jobs Wind Farm CTV Jobs Jobs for Filipino Seafarers Jobs for UK Seafarers Jobs for Indian Seafarers Jobs for Ukrainian Seafarers Jobs for Russian Seafarers Jobs for Indonesian Seafarers