Maritime Questions › Wah Human Factors
Why should fatigue be specifically considered when assigning personnel to height work tasks?
A. Fatigue has no measurable effect on height work safety
B. Fatigue is only relevant to watchkeeping duties, not deck tasks
C. Fatigue only matters if the worker reports feeling tired
D. Fatigue degrades concentration, grip strength, balance, and judgement — all of which are directly relevant to fall risk and safe equipment use
Sign in or create a free account to see the answer and explanation.
A. The deck area should be cleaned and the slope/level checked against the MEWP's rated operating limits before deployment; if outside those limits, a different position or method should be used
B. Proceed and rely on the MEWP's outriggers to compensate for any surface condition
C. Proceed as normal — MEWPs are designed to handle uneven surfaces automatically
D. Proceed but instruct the operator to move slowly
Sign in or create a free account to see the answer and explanation.
A. No — the worker should receive a specific briefing/familiarisation on the rigid rail system's traveller mechanism, attachment/detachment points, and any system-specific limitations before first use
B. No, but only if the worker has never climbed a mast before at all
C. Yes — all fall protection systems work the same way functionally
D. Yes, provided the harness is the same brand as previously used
Sign in or create a free account to see the answer and explanation.
+6 more Wah Human Factors questions available
Create a free account to practise all 9 questions, track your accuracy, and build your Reputation Score.
Create Free Account