A scaffold erected by shore contractors in drydock has a green tag dated three weeks ago, and a storm with strong winds passed through two nights ago. What should happen before crew use this scaffold?
A. Treat the storm as an event requiring re-inspection before further use, regardless of the tag's date, and have it formally re-inspected and re-tagged before anyone climbs it
B. Only re-inspect if visible damage is spotted from the ground
C. Continue using it since the tag is still green and has not expired
D. Assume the contractor will automatically re-inspect without being asked
Sign in or create a free account to see the answer and explanation.
A. The issue only matters when working over water
B. No issue — any certified anchor point is fine regardless of position
C. This creates a swing fall hazard; the anchor should be repositioned more directly above the work area, or the risk assessment should specifically address the swing radius and any structure the worker could strike
D. The issue only matters if the worker is overweight
Sign in or create a free account to see the answer and explanation.
A. Allow it, since their prior experience demonstrates it is safe
B. Allow it only if they walk quickly to minimise time on the surface
C. Deny direct access across the skylights; treat them as a fragile surface requiring fall-arrest protection, physical covers, or a controlled route around them, regardless of past experience
D. Allow it if they remove their boots to reduce point loading
Sign in or create a free account to see the answer and explanation.