Maritime QuestionsVetting — ISM Documentation

Tokyo MoU groups MARPOL deficiencies into separate sub-codes for Annex I (Oil), Annex II (NLS/Chemicals), Annex III (Dangerous Goods), Annex IV (Sewage), Annex V (Garbage), and Annex VI (Air Pollution), rather than one single "pollution" category. What is the practical reason for this granularity?

A. A single vessel can only be found deficient under one Annex per inspection, so the codes prevent double-counting
B. Each Annex has its own distinct equipment, record-keeping, and operational requirements (e.g. Annex V garbage record book and segregation rules are entirely different from Annex VI engine/fuel emissions compliance), so lumping them together would obscure which specific system or competency is actually failing and make trend analysis across the fleet meaningless
C. The sub-division is purely historical and has no bearing on what is actually inspected
D. Only Annex I and Annex VI are ever actually enforced; the others are recorded for statistical completeness only
Sign in or create a free account to see the answer and explanation.
Paris MoU explicitly treats ISM (Document of Compliance / Safety Management Certificate) deficiencies as "clear grounds" for a more detailed PSC inspection. Why does an ISM finding trigger this escalation rather than being treated as an isolated paperwork issue?
A. ISM-related escalation only applies to vessels under 500GT
B. ISM failures suggest a systemic management weakness rather than a single defective item — if the safety management system itself is not functioning, the inspector cannot trust that any other area of the ship is being properly controlled either, so the scope of inspection is widened to verify the rest of the vessel independently
C. ISM deficiencies are purely administrative and have no bearing on the rest of the inspection scope
D. A more detailed inspection is only triggered by structural deficiencies, never by ISM findings
Sign in or create a free account to see the answer and explanation.
SIRE 2.0 Ch.2.4 (Defect Management) and Tokyo MoU code 01106/01107 (DoC/SMC) both probe how a vessel handles known deficiencies. What is the key distinguishing feature of a genuinely functioning defect management process, as opposed to one that merely looks compliant on paper?
A. Defect management is solely the company's shore-based responsibility and is not something the Master or officers are assessed on
B. Defects only need to be logged if they affect class certification, not general maintenance items
C. Any defect log, regardless of whether items are ever closed out, satisfies the requirement
D. Defects are formally logged with a realistic timeline and resourcing for correction, tracked to closure, and escalated to the company/DPA if not resolved within the planned period — rather than being logged once and then left open indefinitely or quietly removed from the list without genuine rectification
Sign in or create a free account to see the answer and explanation.
+4 more Vetting — ISM Documentation questions available

Create a free account to practise all 7 questions, track your accuracy, and build your Reputation Score.

Create Free Account