Maritime Questions › Vetting — ISM Documentation
A Master is asked by an inspector to explain the company's "Management of Change" procedure (SIRE 2.0 Ch.2.5) in relation to a recently modified mooring winch braking system. The Master is unaware any modification took place. What does this reveal, beyond the immediate technical issue?
A. This is not a finding as long as the modified winch is currently functioning correctly
B. Management of Change only applies to modifications made by shore-based engineers, not crew-initiated repairs
C. The Master is not expected to know about equipment modifications under any circumstances
D. A breakdown in the Management of Change process itself — any modification to safety-critical equipment should be risk-assessed, approved, and communicated up through the SMS before or immediately after the change, and a Master being unaware of it indicates the control has failed regardless of whether the modification itself was done competently
Sign in or create a free account to see the answer and explanation.
A. ISM-related escalation only applies to vessels under 500GT
B. ISM failures suggest a systemic management weakness rather than a single defective item — if the safety management system itself is not functioning, the inspector cannot trust that any other area of the ship is being properly controlled either, so the scope of inspection is widened to verify the rest of the vessel independently
C. ISM deficiencies are purely administrative and have no bearing on the rest of the inspection scope
D. A more detailed inspection is only triggered by structural deficiencies, never by ISM findings
Sign in or create a free account to see the answer and explanation.
A. Defect management is solely the company's shore-based responsibility and is not something the Master or officers are assessed on
B. Defects only need to be logged if they affect class certification, not general maintenance items
C. Any defect log, regardless of whether items are ever closed out, satisfies the requirement
D. Defects are formally logged with a realistic timeline and resourcing for correction, tracked to closure, and escalated to the company/DPA if not resolved within the planned period — rather than being logged once and then left open indefinitely or quietly removed from the list without genuine rectification
Sign in or create a free account to see the answer and explanation.