Why did Paris MoU and Tokyo MoU run a joint Concentrated Inspection Campaign (CIC) on Ballast Water Management (BWM) in late 2025, given that BWM has been a convention requirement for several years?

A. CICs replace routine PSC inspections entirely during the campaign period
B. CICs are used to focus inspector attention industry-wide on a specific compliance area where deficiency data shows a persistent or rising problem (Tokyo MoU recorded over 1,000 BWM deficiencies in 2024 alone) — practical compliance often lags well behind a convention's formal entry into force, and a CIC is the regime's tool for closing that gap through concentrated, comparable data collection across the whole fleet over a fixed period
C. CICs are run at random with no connection to deficiency statistics
D. Ballast Water Management became a PSC-enforceable requirement for the first time in 2025
Sign in or create a free account to see the answer and explanation.
Paris MoU explicitly treats ISM (Document of Compliance / Safety Management Certificate) deficiencies as "clear grounds" for a more detailed PSC inspection. Why does an ISM finding trigger this escalation rather than being treated as an isolated paperwork issue?
A. ISM-related escalation only applies to vessels under 500GT
B. ISM failures suggest a systemic management weakness rather than a single defective item — if the safety management system itself is not functioning, the inspector cannot trust that any other area of the ship is being properly controlled either, so the scope of inspection is widened to verify the rest of the vessel independently
C. ISM deficiencies are purely administrative and have no bearing on the rest of the inspection scope
D. A more detailed inspection is only triggered by structural deficiencies, never by ISM findings
Sign in or create a free account to see the answer and explanation.
SIRE 2.0 Ch.2.4 (Defect Management) and Tokyo MoU code 01106/01107 (DoC/SMC) both probe how a vessel handles known deficiencies. What is the key distinguishing feature of a genuinely functioning defect management process, as opposed to one that merely looks compliant on paper?
A. Defect management is solely the company's shore-based responsibility and is not something the Master or officers are assessed on
B. Defects only need to be logged if they affect class certification, not general maintenance items
C. Any defect log, regardless of whether items are ever closed out, satisfies the requirement
D. Defects are formally logged with a realistic timeline and resourcing for correction, tracked to closure, and escalated to the company/DPA if not resolved within the planned period — rather than being logged once and then left open indefinitely or quietly removed from the list without genuine rectification
Sign in or create a free account to see the answer and explanation.