Maritime Questions › Stability Cargo Master

You are presented with a cargo of iron ore fines. Recent rainfall has occurred at the loading port. Describe your obligations under the IMSBC Code before loading.

A. Recent rainfall has no effect on iron ore moisture content as iron ore is an inorganic mineral. The moisture certificate remains valid regardless of weather.
B. The shipper's moisture certificate always takes precedence. The master cannot legally refuse to load cargo for which the shipper has provided a moisture certificate.
C. IMSBC GROUP A CARGO — IRON ORE FINES PRE-LOADING ASSESSMENT: IMSBC CODE GROUP A: cargoes that may liquefy when shipped above their Transportable Moisture Limit (TML). Iron ore fines are a GROUP A cargo under the IMSBC Code (Schedule). Liquefaction risk: when shipped above TML, vibration during the voyage causes solid cargo to behave as a liquid — flow shifts occur, vessel develops list, potentially capsizing rapidly. RECENT RAINFALL: this is the critical context. Post-rainfall — iron ore fines absorb surface water. The moisture content may have risen ABOVE the TML. PRE-LOADING MANDATORY REQUIREMENTS: (1) MOISTURE CONTENT CERTIFICATE: the shipper MUST provide a certificate showing the moisture content of the cargo and confirming it is below the TML. This must be issued within 7 days of loading; (2) TML CERTIFICATE: the shipper must provide the TML for the specific cargo (tested at an approved laboratory). The TML must be certified; (3) FLOW MOISTURE POINT TESTING: the TML is typically 90% of the Flow Moisture Point (FMP); (4) MASTER's ASSESSMENT: (a) Compare the certified moisture content with the TML; (b) If moisture content ≥ TML — REFUSE TO LOAD; (c) If recent rainfall and moisture certificate seems inconsistent (very dry result after heavy rain) — request re-testing or independent test; (5) CAN TEST (INFORMAL): shake a can-sized sample of the cargo to see if moisture separates. This is an indicator — it is NOT a substitute for formal laboratory testing; (6) INDEPENDENT LABORATORY: the master may request an independent moisture test from an approved laboratory if they question the shipper's certificate.
D. Load the iron ore fines and monitor during the voyage. If liquefaction begins, counter-ballast to correct any developing list.
Sign in or create a free account to see the answer and explanation.
Before departure from Durban, your stability program shows the vessel meets 5 of the 6 IS Code criteria but the righting lever arm at 30° (GZ at 30°) is 0.18m against the required minimum of 0.20m. What do you do?
A. Only the stability program minimum acceptable values matter for commercial voyages. IS Code criteria are guidelines, not mandatory requirements.
B. The vessel is close enough to the 0.20m requirement. A margin of 0.02m is within normal calculation tolerance and the vessel can depart.
C. Consult the charterer. As the cargo interests are driving the loading plan, the charterer is responsible for stability compliance.
D. IS CODE CRITERIA — GZ AT 30° DEFICIENCY: THE SIX IS CODE CRITERIA (MSC.267(85) — IS Code 2008): the International Stability Code mandates SIX stability criteria that ALL must be satisfied: (1) Area under GZ curve from 0° to 30° ≥ 0.055 m·rad; (2) Area under GZ curve from 0° to 40° ≥ 0.090 m·rad; (3) Area under GZ curve from 30° to 40° ≥ 0.030 m·rad; (4) GZ AT 30° ≥ 0.200m; (5) MAXIMUM GZ at angle ≥ 25°; (6) GM₀ ≥ 0.150m. FAILING ONE CRITERION MEANS FAILURE: all six criteria must be satisfied simultaneously. A GZ at 30° of 0.18m (vs required 0.20m) is a FAILURE — the vessel does NOT meet IS Code intact stability criteria. THE VESSEL CANNOT DEPART: it would be UNSEAWORTHY for the intended sea voyage. REMEDIES — HOW TO CORRECT THE DEFICIENCY: (1) REDUCE CARGO: if cargo is high in the vessel, shifting weight lower increases the GZ at 30°; (2) LOWER THE G: reduce KG by: (a) Adding low ballast (double bottom tanks); (b) Removing top-heavy weights; (c) Shifting cargo lower; (3) INCREASE BEAM LOADING: for certain hull forms, a different loading pattern affects the GZ curve shape; (4) REDUCE FREE SURFACE: if slack tanks are contributing to reduced GM — fill or empty tanks to remove free surface effect; DOCUMENTATION: the master must not sail with a stability calculation showing non-compliance. This is ISM non-conformity — notify DPA. LEGAL: departure with known stability non-compliance = MSA 1995 Section 58 offence (taking an unseaworthy ship to sea).
Sign in or create a free account to see the answer and explanation.
Your vessel is listing to starboard at a steady angle of approximately 8°. The deck officer believes this is a list due to off-centre cargo but the second officer suspects angle of loll. How do you distinguish, and what are the correct actions?
A. ANGLE OF LOLL vs LIST — IDENTIFICATION AND RESPONSE: DISTINGUISHING FEATURES: (1) LIST (caused by off-centre weight): (a) The vessel rests to one side; (b) GM is POSITIVE; (c) The GZ curve is displaced sideways but still positive; (d) Filling a tank on the high side (away from the list) will CORRECT the list; (e) The vessel has a definite "preferred" upright position but is offset by the asymmetric loading; (2) ANGLE OF LOLL (caused by NEGATIVE GM): (a) The vessel has ZERO or NEGATIVE GM; (b) The GZ at zero degrees is ZERO; (c) The vessel has no stable upright position — it lolls to one side where the GZ curve has positive values; (d) The vessel may flop between loll to port and loll to starboard; (e) IDENTIFYING CHARACTERISTIC: if you forcibly push the vessel further to the loll side — it continues to heel further. If you push a listed vessel — it resists and returns; HOW TO DISTINGUISH ON THE VESSEL: (1) Look at the GZ curve from the loading computer: is GM positive (list) or zero/negative (loll)?; (2) Apply a small external force: does the vessel resist (list) or comply (loll)?; CORRECT ACTION FOR LOLL: (1) DO NOT FILL HIGH-SIDE DOUBLE BOTTOM TANKS FIRST: the counter-intuitive nature of loll. Adding ballast on the high side RAISES the centre of gravity FURTHER — makes GM MORE negative — the loll worsens. The vessel may VIOLENTLY FLOP to the opposite side; (2) CORRECT ACTION: add ballast SYMMETRICALLY to the LOWEST point first. Fill lowest double bottom tanks evenly port and starboard to lower G and raise GM above zero; (3) NOTIFY DPA: this is a serious stability situation.
B. Fill the high-side (port) double bottom tanks immediately. Adding ballast to the high side always corrects any form of list or loll.
C. An 8° list at sea is normal and acceptable. No action is required unless the angle increases beyond 15°.
D. Open the cross-flooding valves to transfer ballast from the starboard to the port tanks. Cross-flooding always corrects asymmetric stability issues.
Sign in or create a free account to see the answer and explanation.
+7 more Stability Cargo Master questions available

Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.

Create Free Account