Maritime Questions › Shiphandling Engine Failure Cascade
After the event, the spring line that took the heavy load is inspected. It shows visible damage (stretched fibres, a section of reduced diameter) but did not part. What should be done with this line?
A. The line should be discarded immediately without any assessment, regardless of whether a replacement is available
B. It should be taken out of service and not relied upon again as a primary mooring line until properly assessed by someone competent to judge its remaining strength, since visible damage from an overload event can significantly reduce a line's safe working load even if it did not actually part — "it held, so it must still be fine" is not a safe assumption
C. Since it did not part during the event, it can be returned to normal service without any further inspection or restriction
D. Visible damage to a mooring line never affects its remaining strength or safe working load
Sign in or create a free account to see the answer and explanation.
A. Take no action since the spring line alone is assumed sufficient to control the vessel indefinitely
B. Immediately let go all remaining lines, assuming this will resolve the situation
C. Immediately inform the engine room directly (not just via telegraph) of the non-response, assess the vessel's current trajectory and what is still controlling it (the spring line, remaining wind effect, any tug), and prepare to use those remaining resources while engine control is investigated — do not wait passively for the engine to respond on a repeated order
D. Repeat the same telegraph order several times and wait without taking any other action
Sign in or create a free account to see the answer and explanation.
A. The spring line could be overloaded beyond its safe working load by the combination of wind force and the bow swing, risking it parting under tension — if it parts, the vessel would suddenly lose the one remaining controlling line with no engine available to compensate, and the snap-back risk to anyone near the line increases as load builds
B. The bow swinging further off the berth is the intended outcome and requires no further attention
C. The only risk is to the berth structure, not to the vessel or its mooring equipment
D. There is no increased risk; the spring line is designed to handle unlimited load regardless of wind or engine state
Sign in or create a free account to see the answer and explanation.
+7 more Shiphandling Engine Failure Cascade questions available
Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.
Create Free Account