Maritime Questions › Shiphandling Engine Failure Cascade
The engine room reports the issue was a control system fault on the bridge telegraph link, not an actual engine problem, and that local (engine room) control is available. What does this change about the immediate response?
A. It changes nothing, since the engine is still considered fully unavailable until the telegraph fault is completely repaired
B. Local control automatically resumes the exact same response speed and precision as bridge telegraph control, with no practical difference
C. This information is irrelevant to the immediate unberthing situation and should be dealt with only after the manoeuvre is complete
D. It opens the option of controlling the engine via direct orders relayed to the engine room for local control, rather than relying on the bridge telegraph — this restores some engine control, but with the caveat of slower response time and the need for very clear, unambiguous verbal order relay between bridge and engine room
Sign in or create a free account to see the answer and explanation.
A. Take no action since the spring line alone is assumed sufficient to control the vessel indefinitely
B. Immediately let go all remaining lines, assuming this will resolve the situation
C. Immediately inform the engine room directly (not just via telegraph) of the non-response, assess the vessel's current trajectory and what is still controlling it (the spring line, remaining wind effect, any tug), and prepare to use those remaining resources while engine control is investigated — do not wait passively for the engine to respond on a repeated order
D. Repeat the same telegraph order several times and wait without taking any other action
Sign in or create a free account to see the answer and explanation.
A. The spring line could be overloaded beyond its safe working load by the combination of wind force and the bow swing, risking it parting under tension — if it parts, the vessel would suddenly lose the one remaining controlling line with no engine available to compensate, and the snap-back risk to anyone near the line increases as load builds
B. The bow swinging further off the berth is the intended outcome and requires no further attention
C. The only risk is to the berth structure, not to the vessel or its mooring equipment
D. There is no increased risk; the spring line is designed to handle unlimited load regardless of wind or engine state
Sign in or create a free account to see the answer and explanation.
+7 more Shiphandling Engine Failure Cascade questions available
Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.