The anchor will not come up in heavy weather and the windlass pressure is high. What is the correct approach?
A. Keep heaving: the windlass is rated for it.
B. Increase hydraulic pressure.
C. Stop heaving at the safe operating limit, take the load off with the engines or by veering, and consider slipping.
D. Tell the forecastle crew to stand closer.
Sign in or create a free account to see the answer and explanation.
A. Nothing — a test lift can proceed immediately after repairs
B. The area within the grab's swing radius should be cleared of personnel before the lift
C. Testing should wait until cargo operations begin
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A. Only the weather forecast for the next watch
B. The lunch schedule for the deck team
C. Who must remain clear of the exclusion zone while the lift takes place
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.