Maritime Questions › Safety & Emergency

A new synthetic spring line is made of high modulus polyethylene. The operator's snap-back plan marks the area abaft the line as a safe area, saying the rope does not recoil. How should you respond?

A. Accept the plan, as the manufacturer's data supports it.
B. Accept it for the spring lines only.
C. Accept it if the working load stays below 25% of the minimum breaking load.
D. Reject it: assess the snap-back zone for each line as if it can recoil, and check the zone on the deck.
Sign in or create a free account to see the answer and explanation.
You're asked to test a deck crane grab after electrical repairs nearby. As the grab is hoisted, what should have happened first?
A. Nothing — a test lift can proceed immediately after repairs
B. The area within the grab's swing radius should be cleared of personnel before the lift
C. Testing should wait until cargo operations begin
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A toolbox talk held before a lifting operation should explicitly cover which of the following?
A. Only the weather forecast for the next watch
B. The lunch schedule for the deck team
C. Who must remain clear of the exclusion zone while the lift takes place
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.
+1682 more Safety & Emergency questions available

Create a free account to practise all 1685 questions, track your accuracy, and build your Reputation Score.

Create Free Account