The first blowback at 2346 caused no harm and the master and chief engineer were told there was no urgent issue. What did the operator's own manual require for the boiler flame-out?

A. Nothing, because boiler faults are routine
B. Treat it as unplanned work: review, toolbox meeting, unplanned-work template and a job hazard analysis
C. Only a log book entry
D. Stop all work until the superintendent arrived
Sign in or create a free account to see the answer and explanation.
You're asked to test a deck crane grab after electrical repairs nearby. As the grab is hoisted, what should have happened first?
A. Nothing — a test lift can proceed immediately after repairs
B. The area within the grab's swing radius should be cleared of personnel before the lift
C. Testing should wait until cargo operations begin
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A toolbox talk held before a lifting operation should explicitly cover which of the following?
A. Only the weather forecast for the next watch
B. The lunch schedule for the deck team
C. Who must remain clear of the exclusion zone while the lift takes place
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.