Maritime Questions › Safety & Emergency

Before any work is carried out on a ship's high-voltage electrical system, what is a "Sanction to Test", and what is generally considered "high voltage"?

A. A Sanction to Test is a formal document/permit issued by an authorised, competent person confirming that specific equipment has been correctly isolated and is safe to test or work on; high voltage onboard typically refers to systems operating above 1000V AC (or as defined by the ship's electrical safety procedures)
B. A Sanction to Test is required only for testing the ship's navigation lights
C. High voltage is defined as any voltage above 24V DC
D. It is a verbal agreement between two crew members with no formal documentation
Sign in or create a free account to see the answer and explanation.
You're asked to test a deck crane grab after electrical repairs nearby. As the grab is hoisted, what should have happened first?
A. Nothing — a test lift can proceed immediately after repairs
B. The area within the grab's swing radius should be cleared of personnel before the lift
C. Testing should wait until cargo operations begin
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A toolbox talk held before a lifting operation should explicitly cover which of the following?
A. Only the weather forecast for the next watch
B. The lunch schedule for the deck team
C. Who must remain clear of the exclusion zone while the lift takes place
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.
+1497 more Safety & Emergency questions available