Maritime Questions › Safety & Emergency

What are the typical testing and record-keeping requirements for a ship's loading computer (loadicator)?

A. The loadicator must be tested periodically (commonly annually) using a set of standard loading conditions/test cases provided by the manufacturer or class, comparing computed results against known correct values, with the test results and any corrective actions recorded and the records retained onboard for inspection
B. Testing is only required after the loadicator software has been completely reinstalled
C. No testing is required once the loadicator has been initially type-approved
D. The loadicator only needs to be tested once, at the time of vessel delivery
Sign in or create a free account to see the answer and explanation.
You're asked to test a deck crane grab after electrical repairs nearby. As the grab is hoisted, what should have happened first?
A. Nothing — a test lift can proceed immediately after repairs
B. The area within the grab's swing radius should be cleared of personnel before the lift
C. Testing should wait until cargo operations begin
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A toolbox talk held before a lifting operation should explicitly cover which of the following?
A. Only the weather forecast for the next watch
B. The lunch schedule for the deck team
C. Who must remain clear of the exclusion zone while the lift takes place
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.
+1497 more Safety & Emergency questions available

Create a free account to practise all 1500 questions, track your accuracy, and build your Reputation Score.

Create Free Account