Maritime QuestionsSafety & Emergency

MGN 560 introduced changes to lifeboat testing requirements, replacing the previous requirement for an annual static load test to 200% of the lifeboat's maximum authorised load. What did MGN 560 introduce instead?

A. It removed all requirements for load testing of lifeboats and falls permanently
B. It applies only to liferafts and has no relevance to lifeboats or davits
C. It introduced a requirement for an initial dynamic test of the davit/winch brake using a load cell, with the peak dynamic load recorded during that test then used as the basis (reference load) for subsequent periodic static tests, on the basis that the previous blanket 200% static load requirement was often unrealistically high and could itself cause damage to davits, winches and brakes
D. It increased the static test load requirement from 200% to 300% of maximum authorised load for all vessels
Sign in or create a free account to see the answer and explanation.
You're asked to test a deck crane grab after electrical repairs nearby. As the grab is hoisted, what should have happened first?
A. Nothing — a test lift can proceed immediately after repairs
B. Testing should wait until cargo operations begin
C. The area within the grab's swing radius should be cleared of personnel before the lift
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A toolbox talk held before a lifting operation should explicitly cover which of the following?
A. Who must remain clear of the exclusion zone while the lift takes place
B. The lunch schedule for the deck team
C. Only the weather forecast for the next watch
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.
+1111 more Safety & Emergency questions available

Create a free account to practise all 1114 questions, track your accuracy, and build your Reputation Score.

Create Free Account