Considering both of MAIB's recommendations together (2020/134 and 2020/135), what two distinct problems do they address?

A. Both address only the physical crane hazard, from different engineering angles
B. One addresses the safety culture and reporting failure; the other addresses the physical exclusion zone and warning system gap at the crush point — two separate failures behind one fatality
C. Both are aimed solely at reducing alcohol use aboard the vessel
D. Both are procedural recommendations with no engineering component
Sign in or create a free account to see the answer and explanation.
You're asked to test a deck crane grab after electrical repairs nearby. As the grab is hoisted, what should have happened first?
A. Nothing — a test lift can proceed immediately after repairs
B. The area within the grab's swing radius should be cleared of personnel before the lift
C. Testing should wait until cargo operations begin
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A toolbox talk held before a lifting operation should explicitly cover which of the following?
A. Only the weather forecast for the next watch
B. The lunch schedule for the deck team
C. Who must remain clear of the exclusion zone while the lift takes place
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.