Maritime QuestionsSafety & Emergency

Under the Boat Safety Scheme and general good practice for inland/coastal leisure craft, what should be done with toilet (sewage) waste when near the shore or in a marina?

A. Direct discharge overboard is always acceptable regardless of location
B. Use a holding tank (where fitted) and pump out at a designated facility, or use shoreside toilets — direct discharge close to shore, in marinas, or in specific no-discharge zones is restricted precisely because of the public health and environmental impact of raw sewage in enclosed or shallow waters
C. Holding tanks are only required on vessels used exclusively for racing
D. Sewage discharge rules apply only to vessels with more than 10 berths
Sign in or create a free account to see the answer and explanation.
You're asked to test a deck crane grab after electrical repairs nearby. As the grab is hoisted, what should have happened first?
A. Nothing — a test lift can proceed immediately after repairs
B. Testing should wait until cargo operations begin
C. The area within the grab's swing radius should be cleared of personnel before the lift
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A toolbox talk held before a lifting operation should explicitly cover which of the following?
A. Who must remain clear of the exclusion zone while the lift takes place
B. The lunch schedule for the deck team
C. Only the weather forecast for the next watch
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.
+1111 more Safety & Emergency questions available

Create a free account to practise all 1114 questions, track your accuracy, and build your Reputation Score.

Create Free Account