Maritime Questions › Safety & Emergency
What is a practical, regular check for standing rigging (shrouds and stays) that doesn't require specialist equipment?
A. Standing rigging never needs visual inspection between full professional rig surveys
B. Standing rigging is designed to never show any visible sign of wear before failure
C. Rigging checks are only relevant immediately before an ocean passage, never for coastal sailing
D. A visual and hands-on check running your hand along each wire and swage fitting, feeling for broken strands ("meat hooks") that can snag skin or clothing, and looking closely at swage terminals and clevis pins for cracking, corrosion, or bending — done regularly, this catches many developing problems well before a full professional rig check
Sign in or create a free account to see the answer and explanation.
A. Nothing — a test lift can proceed immediately after repairs
B. The area within the grab's swing radius should be cleared of personnel before the lift
C. Testing should wait until cargo operations begin
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A. Only the weather forecast for the next watch
B. The lunch schedule for the deck team
C. Who must remain clear of the exclusion zone while the lift takes place
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.
+1497 more Safety & Emergency questions available
Create a free account to practise all 1500 questions, track your accuracy, and build your Reputation Score.
Create Free Account