Maritime QuestionsSafety & Emergency

What is "springing off" when leaving an alongside berth, and when might it be useful?

A. Springing off refers only to jumping onto the pontoon before the boat has stopped moving
B. Using a spring line (rigged to pivot the boat around a fixed point on the berth) with engine and helm to swing the bow or stern out and away from the berth in a controlled way — particularly useful in a tight space, in wind or current pinning the boat onto the berth, or where there's limited room to manoeuvre conventionally
C. Springing off is a term used only for launching a boat from a trailer
D. Springing off applies only to vessels without an engine
Sign in or create a free account to see the answer and explanation.
You're asked to test a deck crane grab after electrical repairs nearby. As the grab is hoisted, what should have happened first?
A. Nothing — a test lift can proceed immediately after repairs
B. Testing should wait until cargo operations begin
C. The area within the grab's swing radius should be cleared of personnel before the lift
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A toolbox talk held before a lifting operation should explicitly cover which of the following?
A. Who must remain clear of the exclusion zone while the lift takes place
B. The lunch schedule for the deck team
C. Only the weather forecast for the next watch
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.
+1111 more Safety & Emergency questions available

Create a free account to practise all 1114 questions, track your accuracy, and build your Reputation Score.

Create Free Account