You notice the vessel's man overboard recovery sling or ladder is worn, stiff, or hasn't been checked in a long time. What's the right thing to do?

A. Use a length of pot rope as a temporary substitute if needed
B. Make a mental note to mention it if it's ever actually needed
C. Report it to the skipper and make sure it's repaired or replaced before the next trip — recovery gear has to work for someone who may be unconscious or unable to help themselves
D. Assume the skipper already knows, since checking equipment is their responsibility
Sign in or create a free account to see the answer and explanation.
You're asked to test a deck crane grab after electrical repairs nearby. As the grab is hoisted, what should have happened first?
A. Nothing — a test lift can proceed immediately after repairs
B. The area within the grab's swing radius should be cleared of personnel before the lift
C. Testing should wait until cargo operations begin
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A toolbox talk held before a lifting operation should explicitly cover which of the following?
A. Only the weather forecast for the next watch
B. The lunch schedule for the deck team
C. Who must remain clear of the exclusion zone while the lift takes place
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.