Which factor most directly explains why Honeybourne III's monthly lifting equipment inspections failed to detect the developing chain defect?

A. The chain was too new to show meaningful wear
B. The lifting plan defined no numerical wear limit, and the inspector had no training in chain loading or hydrogen embrittlement
C. The inspections were carried out too infrequently under LOLER
D. The chain manufacturer failed to supply a test certificate
Sign in or create a free account to see the answer and explanation.
You're asked to test a deck crane grab after electrical repairs nearby. As the grab is hoisted, what should have happened first?
A. Nothing — a test lift can proceed immediately after repairs
B. The area within the grab's swing radius should be cleared of personnel before the lift
C. Testing should wait until cargo operations begin
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A toolbox talk held before a lifting operation should explicitly cover which of the following?
A. Only the weather forecast for the next watch
B. The lunch schedule for the deck team
C. Who must remain clear of the exclusion zone while the lift takes place
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.