Maritime Questions › Safety & Emergency
MAIB SB1/2024 identified alternative arrangements to chain-over-static-pin at the derrick head. Which of the following was NOT one of them?
A. Wire and sheave arrangement at the derrick head
B. Swinging arm mechanism replacing the derrick head
C. Hydraulic chain tensioning system with load monitoring
D. A secondary retention wire to prevent the gear falling if the chain fails
Sign in or create a free account to see the answer and explanation.
A. Nothing — a test lift can proceed immediately after repairs
B. Testing should wait until cargo operations begin
C. The area within the grab's swing radius should be cleared of personnel before the lift
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A. Who must remain clear of the exclusion zone while the lift takes place
B. The lunch schedule for the deck team
C. Only the weather forecast for the next watch
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.
+1111 more Safety & Emergency questions available
Create a free account to practise all 1114 questions, track your accuracy, and build your Reputation Score.
Create Free Account