MSN 1872(F) Amendment 1 requires existing 15–24m fishing vessels to have more than one bilge pumping system. What must be true of the secondary system?

A. It must be independently powered from the main bilge pump
B. It must have a greater rated capacity than the main pump
C. It must be permanently installed, not portable
D. It only needs to be tested annually at survey
Sign in or create a free account to see the answer and explanation.
You're asked to test a deck crane grab after electrical repairs nearby. As the grab is hoisted, what should have happened first?
A. Nothing — a test lift can proceed immediately after repairs
B. Testing should wait until cargo operations begin
C. The area within the grab's swing radius should be cleared of personnel before the lift
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A toolbox talk held before a lifting operation should explicitly cover which of the following?
A. Who must remain clear of the exclusion zone while the lift takes place
B. The lunch schedule for the deck team
C. Only the weather forecast for the next watch
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.