Maritime Questions › Safety & Emergency
During your oral exam you are asked: what is the purpose of carrying out a "dead ship" drill or recovery procedure, and what does it test?
A. It tests the vessel's ability to recover from a total loss of main power (blackout) without external assistance, including starting the emergency generator, restoring essential services, and successfully starting the main engine from a cold/dead ship condition — verifying that emergency procedures, battery condition, and starting air/compressed air reserves are adequate
B. Dead ship drills are only relevant to vessels with steam propulsion and have no application to modern diesel-engined vessels
C. It tests how quickly the crew can abandon ship
D. The drill tests only the functioning of navigation lights during a power failure
Sign in or create a free account to see the answer and explanation.
A. Nothing — a test lift can proceed immediately after repairs
B. The area within the grab's swing radius should be cleared of personnel before the lift
C. Testing should wait until cargo operations begin
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A. Only the weather forecast for the next watch
B. The lunch schedule for the deck team
C. Who must remain clear of the exclusion zone while the lift takes place
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.
+1497 more Safety & Emergency questions available
Create a free account to practise all 1500 questions, track your accuracy, and build your Reputation Score.
Create Free Account