Maritime Questions › Safety & Emergency

During routine checks, an engineer notices the fixed fire-fighting system (e.g. CO2 or water mist) for the engine room has a maintenance tag indicating its last inspection is overdue. What should happen?

A. Replace the tag with a new one showing the current date
B. No action needed unless the system is actually needed in an emergency
C. Report it immediately so the overdue inspection/servicing is arranged as a priority — an unserviced fixed fire-fighting system represents a significant gap in the vessel's primary defence against an engine room fire, which is one of the highest-risk fire scenarios on board
D. Only relevant if the system has been discharged before
Sign in or create a free account to see the answer and explanation.
You're asked to test a deck crane grab after electrical repairs nearby. As the grab is hoisted, what should have happened first?
A. Nothing — a test lift can proceed immediately after repairs
B. The area within the grab's swing radius should be cleared of personnel before the lift
C. Testing should wait until cargo operations begin
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A toolbox talk held before a lifting operation should explicitly cover which of the following?
A. Only the weather forecast for the next watch
B. The lunch schedule for the deck team
C. Who must remain clear of the exclusion zone while the lift takes place
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.
+1497 more Safety & Emergency questions available