Maritime Questions › Safety & Emergency

The tender is being prepared for launch with guests aboard for a shore excursion. What pre-departure safety checks are relevant from an engineering perspective?

A. Confirming the tender's engine starts reliably, fuel levels are sufficient for the planned trip plus reserve, bilge pumps/alarms are functional, and any reported defects from previous use have been addressed before guests embark
B. Only checking the tender if it has not been used in over a month
C. None — tender checks are a deck department matter only
D. Fuel checks are unnecessary for short trips
Sign in or create a free account to see the answer and explanation.
You're asked to test a deck crane grab after electrical repairs nearby. As the grab is hoisted, what should have happened first?
A. Nothing — a test lift can proceed immediately after repairs
B. The area within the grab's swing radius should be cleared of personnel before the lift
C. Testing should wait until cargo operations begin
D. Only the crane operator needs to be aware the lift is happening
Sign in or create a free account to see the answer and explanation.
A toolbox talk held before a lifting operation should explicitly cover which of the following?
A. Only the weather forecast for the next watch
B. The lunch schedule for the deck team
C. Who must remain clear of the exclusion zone while the lift takes place
D. The cargo manifest for the next port
Sign in or create a free account to see the answer and explanation.
+1497 more Safety & Emergency questions available

Create a free account to practise all 1500 questions, track your accuracy, and build your Reputation Score.

Create Free Account