An engineer notices a piece of equipment running with a slightly unusual vibration, not yet at a level that would trigger any alarm or formal defect report, and raises it informally for closer monitoring and an earlier-than-scheduled inspection. The inspection finds early-stage wear that, left unaddressed, would likely have caused a failure within weeks. How should this be regarded?

A. It should not be recognised since no formal alarm or defect report was triggered, meaning officially "nothing happened"
B. As a strong example of proactive, anticipatory maintenance practice worth recognising and reinforcing — the engineer noticed a subtle deviation from normal before it reached any formal threshold, and acted on it early, which is exactly the kind of vigilance that prevents an eventual unplanned failure rather than just reacting to one
C. Raising concerns about equipment before a formal threshold is reached should be discouraged as overly cautious
D. This kind of informal observation has no value compared to scheduled, formal inspection alone
Sign in or create a free account to see the answer and explanation.
What is the core purpose of a vessel's Planned Maintenance System (PMS), beyond simply scheduling tasks?
A. A PMS eliminates the need for any reactive/breakdown maintenance once fully implemented
B. To ensure equipment is maintained at intervals based on manufacturer recommendation, class/statutory requirement, and operational criticality before it fails, shifting maintenance from purely reactive (fix it when it breaks) to proactive — with the added benefit of providing a documented, auditable history of what has been done and when
C. The PMS exists purely to generate paperwork for class surveys, with no real operational safety function
D. A PMS is only relevant to engine room equipment and has no application to deck or bridge equipment
Sign in or create a free account to see the answer and explanation.
Why does a well-designed PMS apply different maintenance rigour and spares-holding policy to different pieces of equipment, rather than treating every item identically?
A. All equipment should receive identical maintenance treatment regardless of its function or consequence of failure, for simplicity
B. Criticality assessment is only relevant to DP vessels and has no application to conventional vessels
C. Equipment is assessed for criticality based on the consequence of its failure (safety, environmental, or operational impact) and how quickly that consequence would materialise — safety-critical equipment with no redundancy (e.g. steering gear) warrants tighter maintenance intervals and guaranteed spares availability compared to equipment whose failure has minimal or easily-managed consequence
D. Criticality is determined solely by the original purchase cost of the equipment, not its function or failure consequence
Sign in or create a free account to see the answer and explanation.
+6 more Planned Maintenance Critical Equipment questions available

Create a free account to practise all 9 questions, track your accuracy, and build your Reputation Score.