Maritime Questions › Passage Planning Cm

As Chief Mate preparing for an ocean voyage, describe the mandatory and voluntary reporting systems the vessel must comply with.

A. SHIP REPORTING SYSTEMS — CHIEF MATE's OBLIGATIONS: TYPES OF REPORTING SYSTEMS: (1) MANDATORY REPORTING SYSTEMS (MRS): established by IMO and coastal states under SOLAS V/11 and V/12. Participation is COMPULSORY for vessels in the defined area. Examples: (a) MAREP (UK Mandatory Reporting) — for vessels over 300 GT in UK waters; (b) CALDOVREP (off Calais/Dover) — for vessels over 300 GT in the Dover Strait traffic separation area; (c) French MANCHEREP — for vessels in the English Channel; (d) ECAREG CANADA — for vessels in Canadian eastern waters. Chief mate must know departure procedures and MRCS for each area transited; (2) VOLUNTARY REPORTING — AMVER (Automated Mutual-Assistance Vessel Rescue System): run by the US Coast Guard. For ocean passages. Vessels submit: (a) departure report; (b) position reports every 24 hours; (c) arrival (deviation) report. AMVER allows USCG and other MRCC to plot vessel positions for SAR purposes. No penalty for non-participation but strongly recommended — AMVER participation dramatically improves SAR response time; (3) AUSREP (Australian Ship Reporting System): for vessels entering Australian waters or transiting the Australian Search and Rescue Region. Vessels report departure, daily positions, and arrival. Administered by AMSA; (4) VTS (VESSEL TRAFFIC SERVICES — SOLAS V/12): VTS in port approaches are mandatory. Vessels must: (a) report on the assigned VHF channel; (b) follow VTS instructions; (c) report arrival at designated reporting points; (5) GMDSS POSITION REPORTS: SafetyNET broadcasts provide weather warnings. Vessels should listen and respond to relevant urgent messages.
B. Ship reporting is only required in port. At sea, vessels have no obligation to report their position to any authority.
C. AMVER participation is mandatory for all vessels over 10,000 GT. Non-participation in AMVER results in port entry refusal in the US.
D. VTS reporting is voluntary. Vessels may choose whether to call VTS when entering port approach areas.
Sign in or create a free account to see the answer and explanation.
As Chief Mate, you are responsible for preparing the passage plan for a voyage from Rotterdam to New York. Describe the APEM framework you use and what the master must approve.
A. The passage plan needs only to show the overall course and waypoints. UKC, abort points, and no-go areas are optional detail for experienced navigators.
B. Passage planning is done entirely by the master. The chief mate's role is only to keep watches — not to prepare passage plans.
C. For an open-ocean voyage, plotting a great circle route from Rotterdam to New York is sufficient passage planning. APEM is only needed for coastal passages.
D. PASSAGE PLANNING APEM FRAMEWORK: IMO Resolution A.893(21) — Voyage Planning Guidelines. The APEM framework has four stages: (A) APPRAISAL: gather all relevant information before planning: (1) Nautical charts — identify correct editions, apply NtM corrections. Use largest scale available for all coastal sections; (2) Nautical publications — Sailing Directions (NP27 Bay of Biscay, NP69 North Atlantic, US East Coast Pilot), Light Lists, Tide Tables, Tidal Stream Atlas; (3) Weather routing service — seasonal North Atlantic winter storm track, pilot charts showing prevailing winds, currents, ice limits; (4) Notices to Mariners — weekly, check latest edition NTMs for all charts to be used; (5) Ship's draught and UKC requirements at departure and arrival; (6) Vessel characteristics — manoeuvring data card, stopping distances; (P) PLANNING: using the appraisal information, plan the complete voyage: (1) Berth-to-berth — departure berth Rotterdam, arrival berth New York including pilot boarding ground; (2) Waypoints with clearing bearings/distances from dangers; (3) No-go areas — shoals, traffic separation zones, exclusion areas, offshore installations; (4) Abort points — last point to turn back to Rotterdam safely; (5) UKC calculations at critical shallow sections; (6) Speed calculations for pilot station arrival time and tidal window; (E) EXECUTION: monitoring the voyage against the plan; (M) MONITORING: comparing actual position against planned track throughout. MASTER APPROVAL: the Master must sign the plan before departure — SOLAS V/34 legal obligation.
Sign in or create a free account to see the answer and explanation.
As Chief Mate, it is your responsibility to maintain the vessel's ECDIS and charts. Describe your procedure for ensuring all charts are up to date for a voyage.
A. ECDIS AND CHART MANAGEMENT — CHIEF MATE'S PROCEDURE: ECDIS CHART MANAGEMENT: (1) ENC SOURCE: Electronic Navigational Charts (ENCs) are sourced through an authorised distributor — AVCS (Admiralty Vector Chart Service), PRIMAR, or equivalent national chart authority. The subscription must be current; (2) WEEKLY UPDATES: AVCS provides weekly ENC updates. The chief mate must: (a) connect the ECDIS to the update service weekly; (b) download and apply all updates to ENCs covering the upcoming voyage; (c) verify update application — some ECDIS systems show "cells updated" count; (3) NtM CHECK: for paper charts (on ECDIS backup charts or paper chart primary systems) — weekly Notices to Mariners (NtM) must be applied. UK Hydrographic Office NtMs are published weekly. Each NtM specifies the chart number and correction. Mark each chart in the NtM index with the correction number applied; (4) CORRECTION LOG: maintain a Chart Correction Log recording: chart number, edition, NtMs applied, date of correction. This is a statutory record; (5) CHART CATALOGUE: the Admiralty Chart Catalogue specifies which charts are required for the planned voyage. Ensure all charts are: (a) latest edition; (b) all NtMs up to the current week applied; (6) NEW EDITIONS: when a chart is re-issued (new edition), all previous corrections on the old edition become incorporated. Order the new edition and apply subsequent NtMs from the new edition date; (7) T&P NOTICES: Temporary and Preliminary Notices to Mariners (T&Ps) apply to ENCs as Cell Update information — check these separately from permanent corrections.
B. Charts only need to be updated when they are more than one year old. Weekly NtM updates are optional for offshore ocean voyages.
C. ECDIS automatically updates all charts without any action by the chief mate. No chart correction log is required for ECDIS vessels.
D. Chart corrections apply only to paper charts. ECDIS ENCs are always current as issued and do not require any updates during a vessel's service.
Sign in or create a free account to see the answer and explanation.
+7 more Passage Planning Cm questions available

Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.

Create Free Account