Maritime QuestionsPassage Planning Cm

Your vessel arrives at Immingham with a draught of 12.6m. The port authority states the minimum available depth is 13.8m at High Water Springs (MHWS). The tidal range is 4.8m. Calculate when you can enter.

A. TIDAL WINDOW CALCULATION — IMMINGHAM: VESSEL DRAUGHT AND UKC REQUIREMENT: Draught = 12.6m. Company UKC policy: 10% of draught = 1.26m. Minimum required depth = 12.6 + 1.26 = 13.86m, rounded to 13.9m. AVAILABLE DEPTH: the port states 13.8m at MHWS (Mean High Water Springs). The MHWS is the average of the highest spring tides. TIDAL RANGE AND LEVELS: if MHWS = 13.8m (from chart datum) and MLWS = 13.8 - 4.8 = 9.0m (Mean Low Water Springs). In tidal calculations, we need the depth at a specific time, not just MHWS. MORE ACCURATELY: The tidal height prediction for the specific day of arrival determines available depth: Available depth = Chart datum depth + Tidal height at time T. Required depth = 12.6 + 1.26 = 13.86m. Chart datum depth (from Admiralty Tide Tables / EasyTide): let us say chart datum depth at the approach channel = 9.2m. Then required tidal height = 13.86 - 9.2 = 4.66m. Check the tidal predictions for the day — at what time does the tidal height reach 4.66m on the rising tide? Subtract the transit time through the approach channel. RESULT: only certain times near high water will give sufficient depth. Calculate based on the specific day's tide predictions from Admiralty Tide Tables or the UK Hydrographic Office EasyTide website. VESSEL TRIM: also consider trim — the deepest draught point. If the vessel is 0.3m by the stern, the stern draught is 12.75m, requiring additional tidal height.
B. As the vessel's draught (12.6m) is less than the available depth (13.8m), entry is possible at any time. Tidal calculations are only needed when draught exceeds chart datum depth.
C. The 13.8m minimum depth minus the 12.6m draught gives 1.2m UKC — this is adequate. Enter immediately without further calculations.
D. Contact the port authority and ask them what time to arrive. Tidal window calculation is the port authority's responsibility, not the chief mate's.
Sign in or create a free account to see the answer and explanation.
As Chief Mate, you are responsible for preparing the passage plan for a voyage from Rotterdam to New York. Describe the APEM framework you use and what the master must approve.
A. PASSAGE PLANNING APEM FRAMEWORK: IMO Resolution A.893(21) — Voyage Planning Guidelines. The APEM framework has four stages: (A) APPRAISAL: gather all relevant information before planning: (1) Nautical charts — identify correct editions, apply NtM corrections. Use largest scale available for all coastal sections; (2) Nautical publications — Sailing Directions (NP27 Bay of Biscay, NP69 North Atlantic, US East Coast Pilot), Light Lists, Tide Tables, Tidal Stream Atlas; (3) Weather routing service — seasonal North Atlantic winter storm track, pilot charts showing prevailing winds, currents, ice limits; (4) Notices to Mariners — weekly, check latest edition NTMs for all charts to be used; (5) Ship's draught and UKC requirements at departure and arrival; (6) Vessel characteristics — manoeuvring data card, stopping distances; (P) PLANNING: using the appraisal information, plan the complete voyage: (1) Berth-to-berth — departure berth Rotterdam, arrival berth New York including pilot boarding ground; (2) Waypoints with clearing bearings/distances from dangers; (3) No-go areas — shoals, traffic separation zones, exclusion areas, offshore installations; (4) Abort points — last point to turn back to Rotterdam safely; (5) UKC calculations at critical shallow sections; (6) Speed calculations for pilot station arrival time and tidal window; (E) EXECUTION: monitoring the voyage against the plan; (M) MONITORING: comparing actual position against planned track throughout. MASTER APPROVAL: the Master must sign the plan before departure — SOLAS V/34 legal obligation.
B. Passage planning is done entirely by the master. The chief mate's role is only to keep watches — not to prepare passage plans.
C. For an open-ocean voyage, plotting a great circle route from Rotterdam to New York is sufficient passage planning. APEM is only needed for coastal passages.
D. The passage plan needs only to show the overall course and waypoints. UKC, abort points, and no-go areas are optional detail for experienced navigators.
Sign in or create a free account to see the answer and explanation.
As Chief Mate, it is your responsibility to maintain the vessel's ECDIS and charts. Describe your procedure for ensuring all charts are up to date for a voyage.
A. ECDIS AND CHART MANAGEMENT — CHIEF MATE'S PROCEDURE: ECDIS CHART MANAGEMENT: (1) ENC SOURCE: Electronic Navigational Charts (ENCs) are sourced through an authorised distributor — AVCS (Admiralty Vector Chart Service), PRIMAR, or equivalent national chart authority. The subscription must be current; (2) WEEKLY UPDATES: AVCS provides weekly ENC updates. The chief mate must: (a) connect the ECDIS to the update service weekly; (b) download and apply all updates to ENCs covering the upcoming voyage; (c) verify update application — some ECDIS systems show "cells updated" count; (3) NtM CHECK: for paper charts (on ECDIS backup charts or paper chart primary systems) — weekly Notices to Mariners (NtM) must be applied. UK Hydrographic Office NtMs are published weekly. Each NtM specifies the chart number and correction. Mark each chart in the NtM index with the correction number applied; (4) CORRECTION LOG: maintain a Chart Correction Log recording: chart number, edition, NtMs applied, date of correction. This is a statutory record; (5) CHART CATALOGUE: the Admiralty Chart Catalogue specifies which charts are required for the planned voyage. Ensure all charts are: (a) latest edition; (b) all NtMs up to the current week applied; (6) NEW EDITIONS: when a chart is re-issued (new edition), all previous corrections on the old edition become incorporated. Order the new edition and apply subsequent NtMs from the new edition date; (7) T&P NOTICES: Temporary and Preliminary Notices to Mariners (T&Ps) apply to ENCs as Cell Update information — check these separately from permanent corrections.
B. Charts only need to be updated when they are more than one year old. Weekly NtM updates are optional for offshore ocean voyages.
C. ECDIS automatically updates all charts without any action by the chief mate. No chart correction log is required for ECDIS vessels.
D. Chart corrections apply only to paper charts. ECDIS ENCs are always current as issued and do not require any updates during a vessel's service.
Sign in or create a free account to see the answer and explanation.
+7 more Passage Planning Cm questions available

Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.

Create Free Account