Maritime Questions › Passage Planning Cm
You are planning the pilotage section for a call at the Port of Rotterdam (EuroPoort). What specific elements does the passage plan include for the pilotage section?
A. ROTTERDAM PILOTAGE SECTION — PASSAGE PLAN ELEMENTS: PILOTAGE IS NOT AN EXCUSE TO STOP PLANNING: the passage plan covers the pilotage section in detail because: (a) SOLAS V/34 requires berth-to-berth planning; (b) The master retains overriding authority even with pilot on board; (c) The master must be able to intervene if the pilot makes an error. THE PILOTAGE PLAN ELEMENTS: (1) PILOT BOARDING POSITION: Rotterdam/EuroPoort — pilot boards at the Maas approach at approximately 51°52'N, 3°51'E. Check current pilot boarding arrangements (may vary by season, traffic, vessel size). VHF contact with Rotterdam Vessel Traffic Service on VHF Ch 01 (Maas Approach); (2) VESSEL SPEED AND MANOEUVRING CHECKS: before pilot boarding — steering gear test, engine checks, anchor readiness, echo sounder on. Record in log; (3) VTS NOTIFICATIONS: Rotterdam Port Authority VTS (VHF 11, 12, 13 depending on area of the port). Advance notification requirements — Rotterdam typically requires 1 hour advance notice of pilotage commencement; (4) UKC IN WATERWAY: Rotterdam Waterway (Nieuwe Waterweg) — tide-dependent. Check tidal height required for adequate UKC at proposed arrival time; (5) TIDAL WINDOW: Rotterdam new waterway has some draught restrictions — check Port Authority guidance for deep-draughted vessels; (6) BERTHING PLAN: berth number, berth orientation (which side to), tug requirements (how many, booked?), mooring plan; (7) CONTINGENCY: if engine failure in the Nieuwe Waterweg — limited anchor opportunities. Confirm emergency anchoring positions with pilot in master-pilot exchange.
B. Once the pilot is on board, passage planning is complete. The pilot takes over navigation and no further planning by the chief mate is required.
C. The pilotage section is the pilot's responsibility. The vessel's passage plan ends at the pilot boarding position and resumes when the pilot disembarks.
D. Rotterdam is a simple port approach. No specific passage planning is needed — just follow the pilot's instructions and look at the port chart when you arrive.
Sign in or create a free account to see the answer and explanation.
A. PASSAGE PLANNING APEM FRAMEWORK: IMO Resolution A.893(21) — Voyage Planning Guidelines. The APEM framework has four stages: (A) APPRAISAL: gather all relevant information before planning: (1) Nautical charts — identify correct editions, apply NtM corrections. Use largest scale available for all coastal sections; (2) Nautical publications — Sailing Directions (NP27 Bay of Biscay, NP69 North Atlantic, US East Coast Pilot), Light Lists, Tide Tables, Tidal Stream Atlas; (3) Weather routing service — seasonal North Atlantic winter storm track, pilot charts showing prevailing winds, currents, ice limits; (4) Notices to Mariners — weekly, check latest edition NTMs for all charts to be used; (5) Ship's draught and UKC requirements at departure and arrival; (6) Vessel characteristics — manoeuvring data card, stopping distances; (P) PLANNING: using the appraisal information, plan the complete voyage: (1) Berth-to-berth — departure berth Rotterdam, arrival berth New York including pilot boarding ground; (2) Waypoints with clearing bearings/distances from dangers; (3) No-go areas — shoals, traffic separation zones, exclusion areas, offshore installations; (4) Abort points — last point to turn back to Rotterdam safely; (5) UKC calculations at critical shallow sections; (6) Speed calculations for pilot station arrival time and tidal window; (E) EXECUTION: monitoring the voyage against the plan; (M) MONITORING: comparing actual position against planned track throughout. MASTER APPROVAL: the Master must sign the plan before departure — SOLAS V/34 legal obligation.
B. Passage planning is done entirely by the master. The chief mate's role is only to keep watches — not to prepare passage plans.
C. For an open-ocean voyage, plotting a great circle route from Rotterdam to New York is sufficient passage planning. APEM is only needed for coastal passages.
D. The passage plan needs only to show the overall course and waypoints. UKC, abort points, and no-go areas are optional detail for experienced navigators.
Sign in or create a free account to see the answer and explanation.
A. ECDIS AND CHART MANAGEMENT — CHIEF MATE'S PROCEDURE: ECDIS CHART MANAGEMENT: (1) ENC SOURCE: Electronic Navigational Charts (ENCs) are sourced through an authorised distributor — AVCS (Admiralty Vector Chart Service), PRIMAR, or equivalent national chart authority. The subscription must be current; (2) WEEKLY UPDATES: AVCS provides weekly ENC updates. The chief mate must: (a) connect the ECDIS to the update service weekly; (b) download and apply all updates to ENCs covering the upcoming voyage; (c) verify update application — some ECDIS systems show "cells updated" count; (3) NtM CHECK: for paper charts (on ECDIS backup charts or paper chart primary systems) — weekly Notices to Mariners (NtM) must be applied. UK Hydrographic Office NtMs are published weekly. Each NtM specifies the chart number and correction. Mark each chart in the NtM index with the correction number applied; (4) CORRECTION LOG: maintain a Chart Correction Log recording: chart number, edition, NtMs applied, date of correction. This is a statutory record; (5) CHART CATALOGUE: the Admiralty Chart Catalogue specifies which charts are required for the planned voyage. Ensure all charts are: (a) latest edition; (b) all NtMs up to the current week applied; (6) NEW EDITIONS: when a chart is re-issued (new edition), all previous corrections on the old edition become incorporated. Order the new edition and apply subsequent NtMs from the new edition date; (7) T&P NOTICES: Temporary and Preliminary Notices to Mariners (T&Ps) apply to ENCs as Cell Update information — check these separately from permanent corrections.
B. Charts only need to be updated when they are more than one year old. Weekly NtM updates are optional for offshore ocean voyages.
C. ECDIS automatically updates all charts without any action by the chief mate. No chart correction log is required for ECDIS vessels.
D. Chart corrections apply only to paper charts. ECDIS ENCs are always current as issued and do not require any updates during a vessel's service.
Sign in or create a free account to see the answer and explanation.
+7 more Passage Planning Cm questions available
Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.
Create Free Account