Maritime Questions › Passage Planning
You are navigating a coastal passage using ECDIS. Your examiner asks: "What are the key limitations of ECDIS that an OOW must be aware of?" Name at least 5.
A. The only limitation of ECDIS is that it cannot display tidal stream data. All other navigational information is complete and accurate.
B. ECDIS has no significant limitations — it displays all charted hazards automatically and alarms when the vessel approaches danger. The OOW can safely navigate using ECDIS alone without cross-checking other sources.
C. Key ECDIS limitations: (1) ENC data quality varies — some cells are based on old surveys with poor depth accuracy; (2) chart datum may differ from GPS datum causing position offsets; (3) anti-grounding alarms require correct safety depth/contour settings — poorly configured alarms give false security; (4) display scale can create generalisation errors; (5) software/data update failures may mean the ENC is not current; (6) ECDIS failures (power, software) require immediate switch to backup; (7) over-reliance can reduce situational awareness and lookout effectiveness.
D. ECDIS limitations apply only to vessels using raster charts. Type-approved ECDIS with ENCs has no operational limitations recognised by SOLAS.
Sign in or create a free account to see the answer and explanation.
A. SOLAS V Reg 34 requires a passage plan only for voyages exceeding 200 nautical miles. For shorter voyages a verbal brief to the OOW is sufficient.
B. SOLAS V Reg 34 requires that before proceeding to sea, the master shall ensure that the intended voyage has been planned using adequate and up-to-date charts and nautical publications. The four stages are: APPRAISAL (gather all relevant information); PLANNING (lay the plan on charts from berth to berth); EXECUTION (monitor progress against the plan); MONITORING (cross-check position continuously throughout the voyage).
C. SOLAS V Reg 34 requires the Chief Officer to produce the passage plan and present it to the master for signature. The OOW has no planning responsibility.
D. The four stages are: depart, transit, arrive, anchor. SOLAS V Reg 34 specifies that plans must be filed with the port authority before departure.
Sign in or create a free account to see the answer and explanation.
A. A 6.5m shoal with 7.2m draft has 0.7m of clearance. This is within MCA-approved underkeel clearance limits and no special marking is required.
B. Check the tide tables — if the tide adds 1m of water at the time of passing, the available depth is 7.5m which exceeds your draft of 7.2m with 0.3m to spare. Mark this as a tidal gate in the plan and proceed.
C. The shoal is a no-go area. You would draw a no-go zone on the chart with a safety margin added for squat, wave response, tidal variation, and chart accuracy. A clearing bearing or limiting danger line would be drawn to keep the vessel safely clear. The passage plan waypoints must route the vessel outside this zone. The abort point where you could no longer safely turn back or divert must also be marked.
D. Report the discrepancy to the chart agent as a possible chart error and proceed on the original route pending correction.
Sign in or create a free account to see the answer and explanation.
+7 more Passage Planning questions available
Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.