Maritime QuestionsMARPOL / Environmental

You are the Chief Engineer and discover that the Oily Water Separator (OWS) 15ppm alarm has been triggering frequently during recent operations, and a junior engineer suggests temporarily bypassing the OWS overboard discharge to "save time" during a busy port turnaround, intending to process the bilge water properly once at sea. How should you respond?

A. Permit the bypass since the intention is to "make it right later", which removes any legal concern
B. Allow the bypass as a one-off given the time pressure, provided it is not recorded in the Oil Record Book
C. Allow the bypass but only at night to reduce visibility of the discharge
D. Refuse the bypass under any circumstances — any overboard discharge bypassing the OWS and oil content monitor constitutes illegal discharge under MARPOL Annex I, and instead arrange for bilge water to be retained onboard or discharged ashore via a reception facility, while also investigating the cause of the frequent 15ppm alarms
Sign in or create a free account to see the answer and explanation.
The yacht generates food waste, plastics, and oily rags during a passage more than 12 nautical miles from land. Under MARPOL Annex V, what must happen to the plastics?
A. All plastics must be retained on board for discharge to a port reception facility — discharge of plastics into the sea is prohibited under all circumstances
B. Plastics may be burned in the incinerator and the ash discharged overboard
C. Plastics can be discharged if ground down to less than 25mm
D. They may be discharged overboard once the vessel is more than 12nm from the nearest land
Sign in or create a free account to see the answer and explanation.
Your vessel is preparing to bunker fuel alongside. As Master, what must be in place before bunkering starts under your SOPEP/SMPEP arrangements?
A. Only the engineer needs to be present; deck crew are not involved
B. SOPEP equipment only needs to be available if bunkering more than 50% of capacity
C. Nothing specific — bunkering is routine and does not need pre-checks
D. A pre-bunkering checklist completed (hose connections, drip trays, communication with the barge/terminal, spill response equipment ready and accessible), a dedicated watch maintained throughout, and SOPEP equipment immediately available
Sign in or create a free account to see the answer and explanation.
+111 more MARPOL / Environmental questions available

Create a free account to practise all 114 questions, track your accuracy, and build your Reputation Score.

Create Free Account