Maritime Questions › Heavy Weather Nav Master

You are approaching Singapore at night with 8 radar contacts around you. Your second officer is the OOW, and you have a cadet on the bridge. How do you apply BRM principles to manage safely?

A. BRM MULTI-CONTACT SINGAPORE APPROACH — MASTER's ROLE: BRM PRINCIPLES (STCW A-II/1 and A-VIII/2): Bridge Resource Management involves effective use of all available resources (people, systems, information) to maintain situational awareness and make safe decisions. MASTER's APPROACH — 8 CONTACTS AT NIGHT: (1) MASTER ON BRIDGE: a multi-contact approach to Singapore at night — master is definitely on the bridge. This is in the standing orders as a calling condition; (2) ASSIGN TASKS: (a) Second officer: dedicated radar plot and ECDIS monitoring. Call out any CPA developing inside 1nm; (b) Cadet: dedicated visual and AIS watch. Call out any light identification; (c) Master: overall situational awareness, conning, communication with VTS; (3) PRIORITISE CONTACTS: radar plot each contact. Which have CPA < 1nm within 6 minutes TCPA? These are the priority contacts; (4) NO MULTI-TASKING: in a complex situation — each person has ONE specific task. Do not ask the radar watchkeeper to also plot the chart; (5) COMMUNICATE: clear, unambiguous communication between all bridge team members. Closed-loop communication: task given → acknowledged → confirmed completed; (6) MANUAL STEERING: switch to manual steering on approach to high-traffic areas. Helmsman follows helm orders precisely; (7) VTS CONTACT: maintain contact with VTIS Singapore on required channels; (8) CHALLENGE/CONFIRM: if the master notices something the team has not reported — say so. Challenge. "Second officer, contact 3 miles on 070 — CPA?"; (9) REDUCE SPEED: in congested waters at night — consider speed reduction to give more time; (10) BRIEF THE TEAM: at the start of the approach — brief all team members on the expected traffic pattern and key hazards.
B. The master should take direct control of all navigation tasks personally. In a complex situation, one person managing everything reduces confusion.
C. The second officer is the OOW and is responsible for all contacts. The master observes but does not interfere.
D. Use the autopilot to maintain course accurately. Manual steering introduces helm error in complex situations.
Sign in or create a free account to see the answer and explanation.
Your 180m bulk carrier is in Force 10 seas in the North Atlantic on a westbound Atlantic crossing. What are your strategic options and how do you decide?
A. The weather routing service will direct the vessel. The master should follow routing service recommendations without deviation.
B. Maintain full service speed to get through the storm as quickly as possible. High speed reduces exposure time to dangerous conditions.
C. Run before the storm. A stern-on approach is always the most stable option in heavy weather.
D. FORCE 10 HEAVY WEATHER MANAGEMENT — STRATEGIC OPTIONS: FORCE 10 CONDITIONS: Beaufort 10 = 48-55 knots wind, seas 9-12m, very high waves with overhanging crests. For a 180m bulk carrier: (a) Green water on deck; (b) Risk of structural damage (hatch covers, mooring equipment); (c) Risk of cargo shift (particularly if bulk cargo has high moisture content); (d) Risk of parametric rolling (if heading or speed is near resonance frequency); STRATEGIC OPTIONS: (1) MAINTAIN COURSE — if the vessel can make safe headway, maintaining course at reduced speed may be appropriate. Rule: speed such that no excessive structural stress occurs. Fuel consumption penalty; (2) HEAVE-TO: bring the vessel to approximately 30-40° off the sea on the bow (head to sea, minimal headway). Most comfortable option for weathering out a storm. Significant time and fuel cost; (3) RUNNING BEFORE: stern to sea. Faster progress but: stern-on boarding seas risk; pooping risk; loss of rudder effectiveness in following seas (surf-riding, broaching risk); (4) AVOIDANCE — alter course to skirt around the storm. Use weather routing service data and ECMWF forecast to find the storm track and avoid it; MASTER's DECISION PROCESS: (1) ASSESS STORM TRACK: is it moving, and can you outrun or avoid it?; (2) VESSEL CAPABILITY: what is this vessel's seakeeping in these conditions?; (3) CARGO RISK: is the cargo susceptible to moisture or shifting?; (4) CREW CONDITION: fatigue level; (5) DESTINATION URGENCY: is there a berth window, laycan, tidal window that has commercial significance?; (6) NOTIFY DPA: commercial implications of significant deviation.
Sign in or create a free account to see the answer and explanation.
Your 300m tanker has a draught of 16.5m. You are transiting a channel where the charted depth is 19m but where dredging may have created uneven bottom. Discuss your UKC calculation and minimum clearance policy.
A. UKC CALCULATION — 300M TANKER IN SHALLOW CHANNEL: UKC COMPONENTS: Under-Keel Clearance = Charted Depth − Vessel Draught − Dynamic Allowances. STATIC CALCULATIONS: (1) Chart datum: the charted 19m is referenced to Chart Datum (Lowest Astronomical Tide). Current tidal height must be added; (2) Current draught: 16.5m; (3) Static clearance at chart datum: 19 - 16.5 = 2.5m; (4) During tidal rise: if tide = +1.5m: effective depth = 20.5m; clearance = 20.5 - 16.5 = 4.0m before dynamic allowances; DYNAMIC ALLOWANCES — THESE REDUCE THE EFFECTIVE UKC: (1) SQUAT: a vessel moving through water sinks below its static waterline due to: (a) Pressure distribution under hull; (b) Speed-dependent. For large vessels in shallow water (depth/draught ratio < 3): squat can be calculated using the Barras formula. At 10 knots in a depth/draught ratio of ~1.15 (19/16.5), squat for a 300m tanker may be 1.0-1.5m; (2) HEEL: when turning or in wind — the vessel lists, increasing draught at the lower side. For 1° heel at 32m breadth: heel squat ≈ 0.28m; (3) WAVE RESPONSE: in wave action, the vessel heaves and pitches — the lowest point may be deeper than the static waterline; (4) CHART ACCURACY: the stated 19m may not reflect uneven dredging. A safety margin of 0.5-1.0m should be added; MINIMUM SAFE CLEARANCE POLICY: many companies specify 10-15% of draught = 1.65-2.5m after all dynamic deductions. At 10 knots with 1.5m squat and heel — the available clearance BEFORE wave response and chart inaccuracy is: 2.5m (static) - 1.5m (squat) - 0.28m (heel) = 0.72m. THIS IS INSUFFICIENT for a 300m tanker. REDUCE SPEED to reduce squat.
B. Static UKC = charted depth minus draught = 2.5m. This is adequate and no further calculation is required.
C. UKC is the harbour authority's responsibility. The pilot will advise on adequate clearance for the transit.
D. Increase speed to reduce the transit time in shallow water, thereby minimising exposure to grounding risk.
Sign in or create a free account to see the answer and explanation.
+7 more Heavy Weather Nav Master questions available

Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.

Create Free Account