Maritime Questions › Heavy Weather Master
Your vessel has a calculated GM of 0.4m at the start of a winter North Atlantic passage in ballast condition. A weather routing service advises significant gale force conditions en route. Is 0.4m GM adequate and what additional stability considerations apply?
A. GM 0.4M WINTER NORTH ATLANTIC — STABILITY ASSESSMENT: 0.4m GM is a LOW GM for a winter North Atlantic passage. IS IT ADEQUATE? The SOLAS Intact Stability Code (MSC.267(85)) requires: minimum initial GM of 0.15m. 0.4m exceeds the minimum. BUT THE MINIMUM IS NOT THE TARGET. ADDITIONAL FACTORS FOR THIS VOYAGE: (1) STATIC vs DYNAMIC STABILITY: static GM is the initial resistance to inclination. Dynamic stability is the WORK DONE by the righting arm as the vessel heels — the area under the GZ curve. A vessel with GM = 0.4m but a narrow GZ curve (peak GZ at 15° only) may be less safe than a vessel with GM = 0.3m and a wide, flat GZ curve reaching 45°; (2) WAVE HEELING MOMENT: in Force 10-11 conditions, wind heeling moment must be assessed. The IS Code requires a heeling moment calculation for the maximum wind speed expected. At 0.4m GM and full ballast windage area — this calculation must be made and the stability must remain adequate; (3) ICE ACCRETION: in the North Atlantic in winter — ice formation on superstructure and deck equipment is possible. Ice raises G. Even 10-15 tonnes of ice on the upper works can significantly affect a vessel with 0.4m GM; (4) WATER ABSORPTION: if timber or other water-absorbing cargo on deck — water absorption increases weight at height; (5) HEAVY WEATHER BALLASTING: consider increasing ballast to improve GM before departure. Many vessels in ballast condition can increase ballast to improve stability at the cost of extra fuel consumption; (6) WEATHER ROUTING: request a route that minimises exposure to the worst conditions. A slightly longer route in safer weather may be preferable to a direct route in severe weather with marginal stability.
B. A GM of 0.4m exceeds the SOLAS minimum of 0.15m and is therefore adequate for any ocean voyage. Statutory compliance is the only stability criterion required.
C. The ballast condition is the safest condition for an ocean passage. Ballast removes all cargo weight and maximises stability in heavy weather.
D. Apply trim by the stern to compensate for low GM. A 2-metre trim by stern improves stability and compensates for the low metacentric height.
Sign in or create a free account to see the answer and explanation.
A. COMMAND DECISION — FORCE 11 HEAVY WEATHER: SOLAS V/34 and ISM Code Section 5.3 give the master OVERRIDING AUTHORITY on safety decisions. The charterer cannot override this. ASSESSMENT: (1) STRUCTURAL INTEGRITY: at 35,000 GT bulk carrier in Force 11 — slamming at 5 knots indicates the vessel is taking green water over the bow. Slamming causes cumulative structural fatigue and can cause hatch cover failure — potentially fatal for a bulk carrier. Inspect hatch covers and deck plating; (2) CREW SAFETY: two crew injured — this is already a safety failure. Continuing in Force 11 with injuries risks further crew harm. The master must cease activities that are causing injury; (3) CARGO INTEGRITY: bulk cargo shift risk in extreme rolling. Check cargo for signs of movement or liquefaction; (4) STABILITY: check the stability situation — in heavy weather, free surface effects from ballast movement and deck water may affect GM; COMMAND OPTIONS: (a) HEAVE-TO: turn the vessel into the sea (head-to-sea or bow slightly off) and reduce speed to minimum steerage. This dramatically reduces slamming and deck cargo stress. The vessel makes minimal progress but safety is maximised; (b) RUN WITH THE SEA: in some sea states, running before the sea at controlled speed reduces slamming but risks broaching; (c) SEEK PORT OF REFUGE: assess the nearest available port of refuge and request entry. The port of refuge decision involves: vessel structural condition; crew condition; weather forecast (will it moderate?); port availability and shelter quality; (4) COMMUNICATION: inform the charterer in writing. State the safety grounds under ISM Section 5.3. Document everything. The charterer's commercial demands do not override the master's safety authority.
B. The charterer's commercial requirements take precedence in a time charter. Continue the passage at minimum speed even in Force 11 conditions.
C. Heave-to immediately and do not consider proceeding until the storm is completely past. A master who proceeds at all in Force 11 conditions is reckless.
D. Signal MAYDAY immediately — a vessel in Force 11 with two injured crew and heavy slamming is in distress and requires immediate SAR response.
Sign in or create a free account to see the answer and explanation.
A. PORT OF REFUGE DECISION — MASTER: A 7° permanent list indicates the centre of gravity has shifted — either cargo movement or flooding. This is a SERIOUS STABILITY SITUATION requiring immediate port of refuge consideration. DECISION PROCESS: (1) ASSESS THE CAUSE: is the list from: (a) Cargo shift (if so — is it getting worse? Can it shift further in continuing heavy weather?); (b) Flooding (is water making its way in?); (c) Free surface from shifted ballast or tank changes? (2) ASSESS THE TREND: is the list stable at 7° or worsening? A stable 7° list may be survivable in moderate conditions. A worsening list in Force 10-11 may lead to capsize; (3) STABILITY CALCULATION: run the loadicator with the assumed shifted cargo weight and position. What is the current effective GM? What is the righting arm (GZ) at current heel? Does the vessel have adequate stability reserve?; (4) WEATHER FORECAST: will the storm moderate within 6-12 hours? If yes — can the vessel safely ride it out? If no or uncertain — proceed to port of refuge; (5) ASSESS THE REFUGE PORT: (a) Can the Azores (Horta, Terceira) receive a vessel with 7° list in the current sea state? (b) Is there adequate shelter in the port? (c) Can cargo be restowed there? (d) Is a tug available for assistance if manoeuvring is compromised by the list?; (6) DECLARATION TO COASTAL STATE: contact the Portuguese maritime authority (MRCC Delgada) — request port of refuge entry. Provide vessel condition, stability status, list, cargo shift; (7) PAN PAN: in a vessel with compromised stability, transmit a PAN PAN (urgency) signal. This alerts maritime authorities without the formality of MAYDAY.
B. A 7° list is within operational parameters for a large vessel. Continue to the original destination — 7° list is manageable.
C. Immediately declare MAYDAY and abandon ship. A 7° permanent list from cargo shift is unsurvivable and the vessel should be abandoned immediately.
D. Counter-ballast immediately by filling the port side tanks to correct the list. Do not divert to port — this will resolve the stability issue.
Sign in or create a free account to see the answer and explanation.
+7 more Heavy Weather Master questions available
Create a free account to practise all 10 questions, track your accuracy, and build your Reputation Score.
Create Free Account