Maritime Questions › Engineering / Technical

Before disconnecting a hydraulic line, which question is the most important on a machine like the one on EIDSVAAG MARIN?

A. What is this pressure holding up, and where will it move when the pressure is lost?
B. How much oil is in the tank?
C. What colour is the hose?
D. Who ordered the part?
Sign in or create a free account to see the answer and explanation.
You're draining a thermal oil system that was running normally a short time ago. Before opening the drain point, what should you confirm?
A. Only that the pump has been switched off
B. That the engine logbook has been updated first
C. Nothing extra — thermal oil drains are routine and can be opened immediately
D. That the system has cooled and depressurised, and you are positioned clear of the drain point's discharge path
Sign in or create a free account to see the answer and explanation.
A thermal oil system has been contaminated and needs draining for cleaning. The written procedure tells you to open the drain valve but doesn't specify a cooling-down period or PPE. What should you do?
A. Treat the gap as a hazard in its own right: apply a suitable cooling/depressurising period and full PPE before proceeding, and raise the procedure gap with the Chief Engineer
B. Delegate the task to a junior rating without further briefing, since the procedure covers it
C. Skip the task until a class surveyor is on board
D. Follow the procedure exactly as written — if it doesn't mention cooling or PPE, they're not required
Sign in or create a free account to see the answer and explanation.
+314 more Engineering / Technical questions available

Create a free account to practise all 317 questions, track your accuracy, and build your Reputation Score.

Create Free Account