What specifically caused the keel to separate from Tyger of London's hull?

A. Corrosion of external keel bolts visible in the bilge
B. Failure at a weakened junction between the keel plate and internal keel rods, caused by undocumented fabrication changes made by the shipyard
C. A collision with an underwater object shortly before the failure
D. Overloading of the keel due to excessive sail area for the conditions
Sign in or create a free account to see the answer and explanation.
You're draining a thermal oil system that was running normally a short time ago. Before opening the drain point, what should you confirm?
A. Only that the pump has been switched off
B. That the engine logbook has been updated first
C. Nothing extra — thermal oil drains are routine and can be opened immediately
D. That the system has cooled and depressurised, and you are positioned clear of the drain point's discharge path
Sign in or create a free account to see the answer and explanation.
A thermal oil system has been contaminated and needs draining for cleaning. The written procedure tells you to open the drain valve but doesn't specify a cooling-down period or PPE. What should you do?
A. Treat the gap as a hazard in its own right: apply a suitable cooling/depressurising period and full PPE before proceeding, and raise the procedure gap with the Chief Engineer
B. Delegate the task to a junior rating without further briefing, since the procedure covers it
C. Skip the task until a class surveyor is on board
D. Follow the procedure exactly as written — if it doesn't mention cooling or PPE, they're not required
Sign in or create a free account to see the answer and explanation.