As Chief Engineer taking over a vessel, the Kommandor Susan investigation found that non-genuine bearings had been fitted six years earlier without anyone verifying component authenticity, and extended service intervals continued to be applied as if genuine OEM parts were fitted. What should a Chief Engineer specifically establish to prevent this situation recurring on their own vessel?

A. Trust the classification society's survey records exclusively, since class surveys are assumed to independently verify part authenticity during every survey
B. A documented parts traceability record for every component fitted during overhauls (supplier, part number, OEM certification or equivalent), an audit of overhaul histories on taking over, and a refusal to accept extended service intervals without understanding and verifying the approval basis (i.e. confirming OEM parts are actually fitted if that was the condition of the extension)
C. A verbal understanding with the engineering team that "if it runs fine, the parts were probably fine" is sufficient assurance
D. Apply extended service intervals to all machinery by default, since extensions are generally a sign of a well-maintained vessel
Sign in or create a free account to see the answer and explanation.
You're draining a thermal oil system that was running normally a short time ago. Before opening the drain point, what should you confirm?
A. Only that the pump has been switched off
B. That the engine logbook has been updated first
C. Nothing extra — thermal oil drains are routine and can be opened immediately
D. That the system has cooled and depressurised, and you are positioned clear of the drain point's discharge path
Sign in or create a free account to see the answer and explanation.
A thermal oil system has been contaminated and needs draining for cleaning. The written procedure tells you to open the drain valve but doesn't specify a cooling-down period or PPE. What should you do?
A. Treat the gap as a hazard in its own right: apply a suitable cooling/depressurising period and full PPE before proceeding, and raise the procedure gap with the Chief Engineer
B. Delegate the task to a junior rating without further briefing, since the procedure covers it
C. Skip the task until a class surveyor is on board
D. Follow the procedure exactly as written — if it doesn't mention cooling or PPE, they're not required
Sign in or create a free account to see the answer and explanation.
+248 more Engineering / Technical questions available

Create a free account to practise all 251 questions, track your accuracy, and build your Reputation Score.

Create Free Account