Maritime Questions › Engineering / Technical

What if all four of Kommandor Susan's Caterpillar 3516B-TA generators had received the same non-genuine bearings in the 2019 overhaul (which, in fact, they did) — and DG2 had failed in succession shortly after DG1, before repairs could begin? As an engineer officer, what does this "cascading failure" possibility tell you about how to treat a single unexplained generator failure?

A. Treat a single unexplained catastrophic failure on one unit of a fleet of identical, identically-maintained machines as a possible signal that the same root cause may exist in the sister units — and prioritise inspecting them before relying on them, especially if they share the same overhaul or parts history
B. Assume the failure was random bad luck (a "one in a million" event) and that the probability of a second identical failure is now lower, not higher
C. Wait for the manufacturer to issue a service bulletin before taking any action on the other units, since acting earlier could be seen as exceeding your authority
D. Treat it as an isolated, one-off mechanical fault specific to that unit, and return the other generators to full service as quickly as possible to maintain power availability
Sign in or create a free account to see the answer and explanation.
You're draining a thermal oil system that was running normally a short time ago. Before opening the drain point, what should you confirm?
A. Only that the pump has been switched off
B. That the engine logbook has been updated first
C. Nothing extra — thermal oil drains are routine and can be opened immediately
D. That the system has cooled and depressurised, and you are positioned clear of the drain point's discharge path
Sign in or create a free account to see the answer and explanation.
A thermal oil system has been contaminated and needs draining for cleaning. The written procedure tells you to open the drain valve but doesn't specify a cooling-down period or PPE. What should you do?
A. Treat the gap as a hazard in its own right: apply a suitable cooling/depressurising period and full PPE before proceeding, and raise the procedure gap with the Chief Engineer
B. Delegate the task to a junior rating without further briefing, since the procedure covers it
C. Skip the task until a class surveyor is on board
D. Follow the procedure exactly as written — if it doesn't mention cooling or PPE, they're not required
Sign in or create a free account to see the answer and explanation.
+305 more Engineering / Technical questions available

Create a free account to practise all 308 questions, track your accuracy, and build your Reputation Score.

Create Free Account