Maritime QuestionsEngineering / Technical

While working in the engine room, a high-pressure fuel or hydraulic pipe develops a small pinhole leak, releasing a fine spray that is not immediately obvious. Why is this considered a serious hazard, even though the leak itself seems minor?

A. High-pressure leaks are only a concern on vessels using gas fuel systems
B. It is not a serious hazard — small leaks can be left until the next scheduled maintenance period
C. The only risk is a slip hazard from oil pooling on the deck
D. A fine, high-pressure spray of fuel or hydraulic oil can be invisible or nearly invisible, can penetrate skin causing serious injury (fluid injection injury) if it contacts a hand or other body part, and if it contacts a hot surface (such as exhaust piping) can ignite, creating a fire hazard that is harder to detect and fight than a pooling leak because the source may not be obvious
Sign in or create a free account to see the answer and explanation.
You're draining a thermal oil system that was running normally a short time ago. Before opening the drain point, what should you confirm?
A. Only that the pump has been switched off
B. That the engine logbook has been updated first
C. Nothing extra — thermal oil drains are routine and can be opened immediately
D. That the system has cooled and depressurised, and you are positioned clear of the drain point's discharge path
Sign in or create a free account to see the answer and explanation.
A thermal oil system has been contaminated and needs draining for cleaning. The written procedure tells you to open the drain valve but doesn't specify a cooling-down period or PPE. What should you do?
A. Treat the gap as a hazard in its own right: apply a suitable cooling/depressurising period and full PPE before proceeding, and raise the procedure gap with the Chief Engineer
B. Delegate the task to a junior rating without further briefing, since the procedure covers it
C. Skip the task until a class surveyor is on board
D. Follow the procedure exactly as written — if it doesn't mention cooling or PPE, they're not required
Sign in or create a free account to see the answer and explanation.
+248 more Engineering / Technical questions available

Create a free account to practise all 251 questions, track your accuracy, and build your Reputation Score.

Create Free Account